My WebLink
|
Help
|
About
|
Sign Out
Home
25_1125_PWETC_Packet
Roseville
>
Commissions, Watershed District and HRA
>
Public Works Environment and Transportation Commission
>
Agendas and Packets
>
202x
>
2025
>
25_1125_PWETC_Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/21/2025 12:49:07 PM
Creation date
11/21/2025 12:48:21 PM
Metadata
Fields
Template:
Commission/Committee
Commission/Authority Name
Public Works Commission
Commission/Committee - Document Type
Agenda/Packet
Commission/Committee - Meeting Date
11/25/2025
Commission/Committee - Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project Preference List <br />Pathway Master Plan <br />Total <br />Map Ref. <br />Project Name <br />Description <br />NOTES <br />and Parks Constellation <br />Points <br />Plan Rank <br />Pathway Master Plan Segment on Arterial Roadway with more than 4,000 ADT, with no pathway on either side of the roadway. <br />Parks and Recreation Master Plan Constellation Link <br />Develop a pathway connection that creates a link between the corner of Millwood and Chatsworth <br />Millwood to County Road C2 Link <br />21 <br />through the Ramsey County open space to County Road C2. <br />Trail/Sidewalk <br />10 <br />41 <br />Develop a pathway connection along Alta Vista Drive between Larpenteur Avenue and Reservoir Woods <br />Alta Vista Drive <br />24 <br />Park. <br />Trail/Sidewalk <br />10 <br />41 <br />Develop a pathway connection between County Road B and Commerce Street <br />Partial completed - <br />Albert Street* <br />30 <br />Sidewalk <br />Modify <br />10 <br />41 <br />Develop a constellation link pathway along Aldine St between Oasis Park and Lydia Avenue pathway. <br />Constellation Link B2 <br />CB-2 <br />10 <br />41 <br />Develop a constellation link pathway along Rose Place and Aladdin Street to connect Fisk Street with <br />Constellation Link G1 <br />CG-1 <br />Central Park (Dale Street Soccer Fields) <br />10 <br />41 <br />Develop a constellation link pathway along Oxford Street between County Road B2 pathways and Central <br />Constellation Link G2 <br />CG-2 <br />Park pathway off Brooks Street. <br />10 <br />41 <br />Develop a constellation link pathway along Pascal Street between County Road B2 pathways to <br />Constellation Link H2 <br />I <br />CH-2 <br />Pocahontas Park. <br />10 <br />41 <br />Develop a constellation link pathway along Shryer Avenue and the east side of the Har Mar Mall to <br />Constellation Link L1 <br />CL-1 <br />connect the pathway on Hamline to the pathway of County Road B. <br />10 <br />41 <br />Develop a constellation link pathway along Ryan Avenue and Fernwood Street to connect Bruce Russell <br />Constellation Link L3 <br />CL-3 <br />Park to Keller Mayflower Park. <br />10 <br />41 <br />Develop a constellation link pathway along Chatsworth Street between Roselawn and Shryer to connect to <br />Constellation Link M2 <br />CM-2 <br />Pioneer Park. <br />10 <br />41 <br />Develop a constellation link pathway along Alameda Street between Resevoir Woods and the pathways on <br />Constellation Link M4 <br />CM-4 <br />County Road B. <br />10 <br />41 <br />Develop a constellation link pathway along Dionne Avenue and Galtier Street to connect Tamarack Park to <br />Constellation Link N2 <br />CN-3 <br />the pathway on South McCarrons Boulevard. <br />10 <br />41 <br />34 <br />Marion Street <br />Develop an off road pathway along Marion Street from Larpentuer Avenue to the cul-de-sac <br />Sidewalk <br />Completed 2023 <br />10 <br />41 <br />23 <br />Cohansey St to HANC Connection <br />Develop a pathway connection between Cohansey Street and HANC. <br />Trail/Sidewalk <br />9 <br />57 <br />Develop a constellation link pathway along Lydia Avenue between Highcrest pathway and Brenner Street. <br />Constellation Link A2 <br />CA-2 <br />9 <br />57 <br />Develop a constellation link pathway along County Road C2 beween Langton Lake Park and Fairview <br />Constellation Link B1 <br />CB-1 <br />Avenue pathway. <br />9 <br />57 <br />Develop a constellation link pathway along Mackubin Street and Woodhill Drive to connect pathways to <br />Constellation Link E3 <br />CE-3 <br />Owasso Hills Park to Woodhill Park. <br />9 <br />57 <br />Develop a constellation link pathway along Grotto Street between County Road B2 pathways and Central <br />Constellation Link G3 <br />CG-3 <br />Park Pathways at Sextant Avenue. <br />9 <br />57 <br />Develop a constellation link pathway along Prior Avenue between Roselawn pathway and County Road B <br />Constellation Link K1 <br />CK-1 <br />athwa /Fairview Community Center. <br />1 <br />9 <br />57 <br />Develop a constellation link pathway along Fernwood Street and Roselawn Avenue to connect Garden <br />Constellation Link L4 <br />1 <br />CL-4 <br />Avenue pathways to Bruce Russell Park. <br />9 <br />57 <br />Page 3 of 4 <br />Page 24 of 35 <br />
The URL can be used to link to this page
Your browser does not support the video tag.