My WebLink
|
Help
|
About
|
Sign Out
Home
25_1125_PWETC_Packet
Roseville
>
Commissions, Watershed District and HRA
>
Public Works Environment and Transportation Commission
>
Agendas and Packets
>
202x
>
2025
>
25_1125_PWETC_Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/21/2025 12:49:07 PM
Creation date
11/21/2025 12:48:21 PM
Metadata
Fields
Template:
Commission/Committee
Commission/Authority Name
Public Works Commission
Commission/Committee - Document Type
Agenda/Packet
Commission/Committee - Meeting Date
11/25/2025
Commission/Committee - Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project Preference List <br />Pathway Master Plan <br />Total <br />Map Ref. <br />Project Name <br />Description <br />TYPE <br />NOTES <br />an d Parks Constellation <br />Points <br />Plan Rank <br />Pathway Master Plan Segment on Arterial Roadway with more than 4,000 ADT, with no pathway on either side of the roadway. <br />Parks and Recreation Master Plan Constellation Link <br />Develop a constellation link pathway along Shryer Avenue to connect Lexington Park pathways to Pioneer <br />Constellation Link M1 <br />CM-1 <br />Park. <br />9 <br />57 <br />Develop a constellation link pathway along Chatsworth Street, Roma Avenue, Aglen Street, Ruggles Street <br />Constellation Link M3 <br />and Oxford Street to connect the pathway on Victoria Street to the pathway on Roselawn Avenue. <br />CM-3 <br />9 <br />57 <br />Develep a pathway from Western Avenue into Tamarack Park <br />Completed 2025 - <br />Tamarack Park <br />33 <br />Trail <br />Remove <br />9 <br />57 <br />20 <br />Villa Park Connections <br />Develop a pathway connection from Shryer Ave and from Ryan Ave into Villa Park. <br />Trail/Sidewalk <br />8 <br />67 <br />Constellation Link F1 <br />Develop a constellation link pathway along Oakcrest Avenue between Cohansey Street and Western <br />CF-1 <br />Avenue pathway. <br />8 <br />67 <br />Develop a constellation link pathway along Matilda Street to connec to Materion Park with County Road <br />Constellation Link F4 <br />CIF-4 <br />B2 pathways. <br />8 <br />67 <br />Develop a constellation link pathway along Fernwood Street and Eldridge Avenue to connect Keller <br />Constellation Link L2 <br />CL-2 <br />Mayflower Park to Lexington Park. <br />8 <br />67 <br />17 <br />Heinel Drive Connection <br />Develop a pathway connection between S. Owasso Blvd and County Road C along Heinel Drive. <br />Trail/Sidewalk <br />7 <br />71 <br />Develop a constellation link pathway along Iona Street and Matilda Street to connect Woodhill Park to <br />Constellation Link E2 <br />CE-2 <br />Ma leview Park. <br />7 <br />71 <br />Develop a constellation link pathway through Midland Hills Golf Course between Roselawn Avenue and <br />Constellation Link J1 <br />CJ-1 <br />County Road B pathway. <br />7 <br />71 <br />32 <br />Eustis Street <br />Develop an off road pathway along Eustis Street between County Road B and the cul-de-sac <br />Trail <br />Completed 2023 <br />7 <br />71 <br />14 <br />Langton Lake Loop <br />Develop a pathway that goes around all of Langton Lake. <br />Trail/Sidewalk <br />6 <br />75 <br />22 <br />Eustis to St. Croix Connection <br />Develop a pathway connection between Eustis Street and St. Croix Street. <br />Trail <br />6 <br />75 <br />Constellation Link E1 <br />Develop a constellation link pathway along Matilda Street to connect Mapleview Park to S Owasso <br />CE-1 <br />Boulevard pathway. <br />6 <br />75 <br />Develop a constellation link pathway along Brenner Street/Patton Road between Highcrest Road pathway <br />Constellation Link A3 <br />CA-3 <br />and Sandcastle Park. <br />5 <br />78 <br />Develop a constellation link pathway along Millwood Avenue and Brennue Avenue to connect Valley Park <br />Constellation Link D2 <br />CD-2 <br />to West Owasso Boulevard pathway. <br />5 <br />78 <br />Page 4 of 4 <br />Page 25 of 35 <br />
The URL can be used to link to this page
Your browser does not support the video tag.