My WebLink
|
Help
|
About
|
Sign Out
Home
CCP 11242025
Roseville
>
City Council
>
City Council Meeting Packets
>
2025
>
CCP 11242025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/2/2025 1:30:52 PM
Creation date
12/2/2025 1:30:37 PM
Metadata
Fields
Template:
Roseville City Council
Document Type
Council Agenda/Packets
Meeting Date
11/24/2025
Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
273
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Attachment 1 <br />172 disclosure to the extent such protection is consistent with the Government Data Practices <br />173 Act, Minn. Stat. §13 and state law. <br />174 <br />175 3.8. Field Locations. Company shall provide field locations for its underground Electric <br />176 Facilities within City consistent with the requirements of Minnesota Statutes, Chapter <br />177 216D. <br />178 <br />179 Section 4. FACILITIES RELOCATION. <br />180 <br />181 4.1. Relocation in Public Ways. The Company shall comply with Minnesota Rules, <br />182 part 7819.3100 and applicable City ordinances consistent with law. If a relocation is <br />183 orderedby the City within five years of a prior relocation of the same Electric Facilities, which <br />184 was made at Company expense, the City shall reimburse Company for non-betterment costs <br />185 on a time and material basis, provided that if a subsequent relocation is required because of <br />186 the extension of a City Utility System to a previously unserved area, Company may be <br />187 required to make the subsequent relocation at its expense. <br />188 <br />189 4.2. Relocation in Public Grounds. The City may require the Company at the <br />190 Company’s expense to relocate or remove its Electric Facilities from Public Ground upon <br />191 a finding by the City that the Electric Facilities have become or will become a substantial <br />192 impairment to the existing or proposed public use of the Public Ground. Relocation shall <br />193 comply with applicable city ordinances consistent with law. <br />194 <br />195 4.3. Projects with Federal Funding. City shall not order Company to remove or <br />196 relocate its Electric Facilities when a Public Way is vacated, improved or realigned for a <br />197 right-of-way project or any other project which is financially subsidized in whole or in part <br />198 by the Federal Government or any agency thereof, unless the reasonable non-betterment <br />199 costs of such relocation are first paid to Company. The City is obligated to pay Company <br />200 only for those portions of its relocation costs for which City has received federal funding <br />201 specifically allocated for relocation costs in the amount requested by the Company, which <br />202 allocated funding the City shall specifically request. Relocation, removal, or rearrangement <br />203 of any Electric Facilities made necessary because of the extension into or through the City <br />204 of a federally-aided highway project shall be governed by the provisions of Minnesota <br />205 Statutes, Section 161.46, as supplemented or amended. <br />206 <br />207 4.4 No Waiver. The provisions of this franchise apply only to facilities constructed in <br />208 reliance on a franchise from the City and shall not be construed to waive or modify any rights <br />209 obtained by Company for installations within a Company right-of-way acquired by easement <br />210 or prescriptive right before the applicable Public Ground or Public Way was established, or <br />211 Company's rights under state or county permit. <br />5 <br />Qbhf!215!pg!384 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.