Laserfiche WebLink
Attachment 2 <br />2026 Capital Improvement Plan <br /> Project/Initiative Summary <br />Department/Division: Parks <br />Project/Initiative Title: Upper Villa Park: Softball Field <br />Total Estimated Cost: $15,000 <br />Funding Source: Park Improvement Fund <br />Annual Operating Budget Impact: <br />Project/Initiative Description: <br />This item involves interval upgrades to the ballfield in order to maintain a level of safety, aesthetics and <br />playability. Full field updates are on a rough 5-year interval per industry standards and as identified in <br />the Asset Management Program. This includes major uneven areas including new sod and ag-lime as <br />needed. This may include fence fabric and post replacement as needed. Inspection by staff is bi-annually <br />spring and fall. Intervals are adjusted according to the inspection program. <br /> <br />This item has been deferred several times. This field is badly in need of regrading and infield lip <br />restoration. <br /> <br /> <br />Asset Location: <br />Villa Park <br />2055 Cohansey Blvd. <br />Current Asset Installation Year: <br />Expected Lifespan for Asset: <br />5 Years <br />Asset Location: <br />Page 66 <br />Qbhf!257!pg!472 <br /> <br />