Laserfiche WebLink
Attachment 2 <br />2026 Capital Improvement Plan <br /> Project/Initiative Summary <br />Department/Division: Parks <br />Project/Initiative Title: Acorn: Baseball Field East <br />Total Estimated Cost: $30,000 <br />Funding Source: Park Improvement Fund 411 <br />Annual Operating Budget Impact: <br />Project/Initiative Description: <br />This item involves interval upgrades to the ballfield in order to maintain a level of safety, aesthetics and <br />playability. Full field updates are on a rough 5-year interval per industry standards and as identified in <br />the Asset Management Program. This includes major uneven areas including new sod and ag-lime as <br />needed. This may include fence fabric and post replacement as needed. Inspection by staff is bi-annually <br />spring and fall. Intervals are adjusted according to the inspection program. <br /> <br />The Acorn fields are used most nights of the week by Roseville Area Youth Baseball. <br /> <br />A preliminary inspection reflects fencing, dugout, and drainage issues that need to be <br />repaired. <br /> <br />Asset Location: <br />Acorn Park <br />286 Count Road C W. <br />Current Asset Installation Year: <br />Expected Lifespan for Asset: <br />5 Years <br /> <br />Page 65 <br />Qbhf!256!pg!472 <br /> <br />