My WebLink
|
Help
|
About
|
Sign Out
Home
26_0127_PWETC_Packet
Roseville
>
Commissions, Watershed District and HRA
>
Public Works Environment and Transportation Commission
>
Agendas and Packets
>
202x
>
2026
>
26_0127_PWETC_Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/29/2026 8:53:57 AM
Creation date
1/29/2026 8:52:23 AM
Metadata
Fields
Template:
Commission/Committee
Commission/Authority Name
Public Works Commission
Commission/Committee - Document Type
Agenda/Packet
Commission/Committee - Meeting Date
1/27/2026
Commission/Committee - Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
o Meetings with Owasso Hills have been occurring to discuss standard vs enhanced <br />lighting. <br />Other agency project updates: <br />• Ramsey County <br />o County Road C 4:3 Conversion from Lexington Avenue to Little Canada Road and bridge <br />over railroad <br />Roadway scheduled for 2026 and bridge in 2027. <br />o Fairviewfrom Larpenteurto CR B2 <br />Resurfacing and signalwork, at CR B and Gluek, in 2026. <br />o County Road D from Fairview Avenue to Cleveland Avenue <br />Design in process for2027 project to include resurfacing and construction of a <br />path on the south side. <br />o Victoria Path from County Road C to Harriet Avenue <br />Design in process for2027 project. <br />o Rice from Wheelock to CR B <br />Design in process for 2028 project. A public meeting is tentatively scheduled for <br />February 5. <br />• MnDOT <br />o Snelling Avenue from TH 36 to Grey Fox Road <br />2026 resurfacing to include off -road pathway west of Snelling Avenue from Lydia <br />Avenue to Old Snelling. <br />o TH 280 from Wabash Avenue in St. Paulto 135 W <br />2026 resurfacing. Virtual public meeting to be held February 11 from 6-7pm. <br />• Other <br />o G Line (Metro Transit) <br />Construction 2026-2028. <br />Engineering Updates: <br />• Four summer Public Works Engineering interns have been hired, in addition to the Sustainability <br />and Environmental interns noted below. <br />• Staff will attend the City Engineers conference next week. <br />• Roseville received $63kfor2026 Private Sewer Service I&I Grants from Met Council. Applications <br />went live on January 16 and allfunds were encumbered 6 minutes after opening. <br />Environmental & Sustainability Updates: <br />• Climate Equity Action Plan <br />o Climate Justice Advisory Group meetings continue, with one held December and the <br />third taking place January 24. <br />o The next staff Climate Equity Action Plan work group meetingtakes place February 2. <br />o The deadline forthe first resident survey has been extended to February 1. Another <br />survey will go out to the community when the draft plan is ready to review <br />o AsecondcommunitymeetingwilltakeplaceinlateFebruary —dateTBA <br />PWET Communications Memo Page 2 <br />Page 4 of 84 <br />
The URL can be used to link to this page
Your browser does not support the video tag.