Laserfiche WebLink
131 Option 3 - $35,000 - Pathway funds <br />132 If a layout is approved, the plans would be incorporated with the 2026 PMP which is <br />133 anticipated to be bid in March for summer 2026 construction. <br />134 <br />135 Staff Recommendations <br />136 Consider motion to approve Pascal Street changes as detailed in Option 3. <br />137 <br />138 Requested Council Action <br />139 Motion to approve a layout for Pascal Street. The motion could include no changes to <br />140 Pascal Streets, one of the three staff recommended options for changes, traffic control <br />141 changes and/or other changes as determined by the council. <br />142 <br />143 <br />Jesse Freihammer, Public Works Director <br />Prepared by: <br />1.Location Map <br />Attachments: <br />2.Pilot Project Comments <br />3.Open House Boards <br />4.Open House Comments on Map <br />5.PWETC Presentation Including Three Layouts <br />6.PWETC Excerpt of Minutes <br />144 <br />Page 4 of 4 <br />Qbhf!47!pg!271 <br /> <br />