My WebLink
|
Help
|
About
|
Sign Out
Home
CCP 03022026
Roseville
>
City Council
>
City Council Meeting Packets
>
2026
>
CCP 03022026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2026 1:36:38 PM
Creation date
3/17/2026 1:36:30 PM
Metadata
Fields
Template:
Roseville City Council
Document Type
Council Agenda/Packets
Meeting Date
3/2/2026
Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
152
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4.Responsibility for Construction Engineering <br /> <br />4.1.The County shall be responsible to perform or contract the performance of the <br />construction engineering for all elements of the Project. <br /> <br />5. Project Costs <br /> <br />5.1. Except as provided herein, the County and City will participate in the costs of <br />construction in accordance with the Ramsey County Cost Participation Policy as <br />approved in the 2026-2030 Ramsey County Transportation Improvement Plan. If <br />there is a conflict between the Cost Participation Policy and this Agreement, this <br />Agreement shall prevail. <br /> <br />5.2. County and City will each be responsible for their individual share of the actual <br />total Construction Pay Items, which are estimated in Exhibit B – Engineer’s <br />Estimate. Quantities and unit prices in Exhibit B are estimates. Actual costs for <br />Construction Pay Items shall be based on the contract unit prices and the <br />quantities constructed, determined after Project completion. <br /> <br />5.3. Mobilization, Traffic Control, Alternate Pedestrian Route, Stabilized Construction <br />Exit, and Erosion Control Supervisor are defined collectively as the “Prorated <br />Items” The City percentage of the Prorated Items is calculated as follows: <br /> <br /> <br />(City Cost excluding the Prorated Items Cost) <br />City % Prorated Items = <br />(Total Project Cost excluding the Prorated Items Cost) <br /> <br /> <br />The costs in the Prorated Items calculation will be based on contract unit prices <br />and quantities at the time of contract award. No adjustments in the percentages will <br />be made if unit prices or quantities vary during construction. <br /> <br />5.4. Design Engineering Costs <br /> <br />5.4.1. The City shall pay the County a design engineering fee equal to 12% of the <br />City’s share of the Project’s Road Improvement construction pay items <br />identified in Exhibit B. <br /> <br />5.5. Construction Engineering Costs <br /> <br />5.5.1. The City shall pay the County a construction engineering fee equal to 12% <br />of the City’s share of the Project’s Road Improvement construction pay items <br />identified in Exhibit B. <br /> <br /> <br />Page 3 of 8 <br /> <br />Qbhf!243!pg!263 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.