My WebLink
|
Help
|
About
|
Sign Out
Home
CCP 03022026
Roseville
>
City Council
>
City Council Meeting Packets
>
2026
>
CCP 03022026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2026 1:36:38 PM
Creation date
3/17/2026 1:36:30 PM
Metadata
Fields
Template:
Roseville City Council
Document Type
Council Agenda/Packets
Meeting Date
3/2/2026
Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
152
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WHEREAS, the Project has been designated as County State Aid Project (S.A.P.) 062- <br />648-025 and S.A.P 160-020-059 <br /> <br />NOW, THEREFORE, BE IT MUTUALLY AGREED AS FOLLOWS: <br /> <br /> <br />AGREEMENT <br /> <br />1. Responsibility for Design Engineering <br /> <br />1.1. Plans, specifications, and proposals will be prepared by the County in accordance <br />with Mn/DOT State Aid requirements. <br /> <br />1.2. The County will prepare plans, specifications, and proposals for the Project <br />(“Project Plans”), which will include, among other things, the proposed <br />reconstruction, alignment, profiles, grades, cross sections, paving, concrete curb <br />and gutter, medians, storm sewer, storm water treatment and infiltration basins, <br />pedestrian curb ramps, turf establishment, traffic signals, accessible pedestrian <br />signals, and utility replacement and adjustments. <br /> <br />1.3. Project Plans showing proposed construction will be presented to the City, prior to <br />becoming final, and will be on file at Ramsey County Public Works Department. <br /> <br />1.4. Any costs associated with revisions to the Project Plans after the completion of <br />plans and specifications will be paid for by the party requesting the revisions. <br />Revisions to the Project Plans are subject to approval by both parties. <br /> <br /> <br />2. \[RESERVED\] <br /> <br /> <br /> <br />3. Procurement and Award of Contract <br /> <br />3.1. The County will take bids for the Project in accordance with state law and County <br />procedures. <br /> <br />3.2. The County will prepare an abstract of bids and a cost participation summary <br />based on the lowest responsible bidder’s proposal and will provide the same to the <br />City. <br />3.3. The County will require the City’s concurrence to award a contract to the lowest <br />responsible bidder. <br /> <br /> <br />Page 2 of 8 <br /> <br />Qbhf!242!pg!263 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.