My WebLink
|
Help
|
About
|
Sign Out
Home
26_0324_PWETC_Packet
Roseville
>
Commissions, Watershed District and HRA
>
Public Works Environment and Transportation Commission
>
Agendas and Packets
>
202x
>
2026
>
26_0324_PWETC_Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2026 9:02:34 AM
Creation date
3/25/2026 8:59:10 AM
Metadata
Fields
Template:
Commission/Committee
Commission/Authority Name
Public Works Commission
Commission/Committee - Document Type
Agenda/Packet
Commission/Committee - Meeting Date
3/24/2026
Commission/Committee - Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
64 on hand, but final installation is pending permits and coordination on exact <br />65 placement. A second phase will begin in the spring. <br />66 Willow Pond Project <br />67 The project has been delayed due to the need for an Environmental <br />68 Assessment Worksheet (EAW). A consultant has been hired, and the <br />69 Commission may review it around June. Construction could occur in late fall <br />70 or winter, depending on timing. <br />71 Keva Park Pathwav <br />72 City Council directed staff to proceed with a basic pathway installation <br />73 (Option C), keeping the roadway unchanged. <br />74 Lighting & Neighborhood Updates <br />75 Intersection lighting improvements will resume in the spring. In the Owasso <br />76 Hills neighborhood, residents generally support enhanced lighting. An <br />77 appraisal is underway, and there may be future discussion of amending the <br />78 policy depending on the findings. <br />79 Ramsey County Projects IV <br />80 Ramsey County has significant work planned over the next several years: <br />81 County Road C (2026): Mill and overlay from Lexington Avenue to Little <br />82 Canada Road; bridge work to follow the next year. <br />l <br />83 Fairview Avenue: Resurfacing from Larpenteur Avenue to County Road B2, <br />84 including signal work at County Road B and Gluck Lane, plus some roadway <br />85 redesign. <br />86 County Road D (Design for 2027): Proposed pathway addition on the south <br />87 side from Cleveland Avenue to Fairview Avenue. <br />88 Victoria Street (2028 project): Currently in design. <br />89 Rice Street (2028 project): From Wheelock Parkway to County Road B; <br />90 coordinated with G Line transit improvements. <br />91 Larpenteur Avenue: Corridor study beginning soon. <br />92 NI1nD0T Proiects <br />93 Snelling Avenue: Mill and overlay beginning around April 15, to be <br />94 completed before the State Fair; includes west -side pathway from Lydia <br />95 Avenue to Old Highway 8. <br />96 Highwav 280: Resurfacing project spanning two years <br />Page 3 of 18 <br />Page 28 of 43 <br />
The URL can be used to link to this page
Your browser does not support the video tag.