|
$300.00
<br />$5,000.00$5,992.60$3,500.00
<br />$25,000.00$55,847.57$17,111.11$61,555.26$49,289.42$65,258.88$20,000.00$40,000.00
<br />$30,000.00
<br />$310,555.56$193,558.95$308,339.20
<br />$1,131,308.55
<br />TotalTotal
<br />$6.56
<br />$34.97$44.67$57.38$63.08
<br />$141.70$100.00
<br />$5,000.00$3,500.00
<br />$25,000.00$55,847.57$17,111.11$20,000.00$40,000.00$30,000.00
<br />$310,555.56
<br />$1,131,308.55$1,161,308.55
<br />Insituform Technologies USA, LLCInsituform Technologies USA, LLC
<br />PricePrice
<br />$5,000.00$1,200.00$9,500.00$3,000.00$4,500.00$7,500.00
<br />$25,000.00$30,000.00$60,000.00$15,000.00$50,000.00$67,522.00$55,835.00$59,688.00
<br />$243,540.00$533,120.00
<br />$1,110,405.00
<br />Estimated TotalEstimated Total
<br />$6.00
<br />$44.00$49.00$65.00
<br />Engineer EstimateEngineer Estimate
<br />$245.00$400.00$100.00
<br />$5,000.00$3,000.00$4,500.00$7,500.00
<br />$25,000.00$60,000.00$15,000.00$50,000.00$30,000.00
<br />$1,110,405.00$1,140,405.00
<br />Estimated PriceEstimated Price
<br />111113111
<br />95
<br />859
<br />5,5351,3782,1769,948
<br />AllowanceBase
<br /> Quantity Quantity
<br /> UnitALLOWALLOW UnitL SL SL SL FL FL FL FL FEACHEACHEACHEACHEACH
<br />Bid Opening4/2/2026 DescriptionREPAIR ALLOWANCERESTORATION ALLOWANCE DescriptionMOBILIZATIONTRAFFIC CONTROLBypass8" CIPP LINING10" CIPP LINING12" CIPP LINING24" CIPP LININGCLEANING AND
<br /> TELEVISINGTRIM PROTRUDING TAPSROBITICALLY REINSTATE SERVICETRANSITION LINERSSHORT LINER/INTERNAL POINT REPAIR (8" - 12" DIAMETER)SHORT LINER/INTERNAL POINT REPAIR (24" DIAMETER)
<br />2503.6032503.6032021.5012563.6012503.6012503.6032503.6032503.6032503.6032503.6032104.6022503.6032503.6032503.6032503.603
<br />Bid Release3/12/2026 Number Number
<br />123456789
<br />141510111213
<br />Contract 2026 Sewer Lining Project - Bid Abstract Report Date4/2/2026Allowance LineAllowance TotalsBase LineBase Bid Totals
<br />
<br />
|