Laserfiche WebLink
o Gateway Bridge Project <br />Interagency meeting kickoff held forthe 2031 project on 135W, TH 36 and 12-14 <br />bridgesfrom Fairview Avenue to the east. <br />• Other <br />o G Line (Metro Transit) <br />Construction 2026-2028. <br />o Private Utilities <br />• Xcel is inspecting and replacing poles around town throughoutthe year. They are <br />also undergounding lines in seven small areas where damage to lines is <br />reoccurring and problematic. <br />• Lumen is placingnewfiber on TransitAvenuefrom Rice Streetto Western Avenue. <br />Engineering Updates: <br />• Roseville has remainingwater efficiency rebatesto use until June 30. An application has been <br />submitted forthe 2026-2028 grant cycle. <br />Environmental& Sustainability Updates: <br />• Climate Equity Action Plan Draft is available for review on the City website thru June 6. <br />http://www.cityofroseviIte.com/4004/Climate-EquityL-Action-Plan <br />• DeVonte Roberts is thisyear's Sustainability Intern and has started part time until goingfulltime <br />this summer. <br />• The second Native Plant Sale with MNLwill open for orders thru May 14, for pickup May 30. Both <br />residents of Roseville and non-residents can place orders at <br />http://www.cityofroseville.com/3979/Roseville-Native-Plant-Sate <br />• The EAW was submitted to the Environmental Quality Board (EQB) Monitor on March 24 and is <br />also posted on our website for public comment thru April30. The EAW will be discussed at the <br />MayPWETmeeting. htto://www.cityofroseviIle.com/willowpond <br />• The annual stormwater update, to fulfill MS4 permit requirements, is scheduled for May 19 <br />during the PWET meeting. <br />• Clean Up Day is April25, 2026, from 8am to 1 pm, at the Dale St. Soccer Fields (2555 Dale St. <br />Roseville, MN). Open to Roseville residents only. <br />• Shredding Day is May 16, 2026, from 9am to noon, held in the parking lot of City Hall (2660 Civic <br />Center Drive, Roseville, MN). Open to Roseville residents only. <br />Maintenance Updates: <br />• Street and Storm <br />o Early Spring Street sweeping of roads/parking lots completed (400 yards of material). <br />o Checking/clearing all catch basins to clean out the backs of debris. <br />o Fifth compost turning of 2025 fall leaves completed. <br />o Begin pathway patching problem areas. <br />o Grindingtrip hazards on concrete sidewalks. <br />o Spring restoration of water break repairs in the roadway. <br />o Seasonal equipment changeoverfrom winterto summer. <br />o Ongoing storm sewer and sign maintenance. <br />o Earth daytrash pickup events by Hawkins and University of Northwestern. <br />o Springturf restorations/mailbox repairs from winter maintenance operations. <br />o Spring stormwater sump cleaning and mosquito control. <br />PWET Communications Memo Page 3 <br />Page 14 of 165 <br />