My WebLink
|
Help
|
About
|
Sign Out
Home
26_0519_PWETC_Packet
Roseville
>
Commissions, Watershed District and HRA
>
Public Works Environment and Transportation Commission
>
Agendas and Packets
>
202x
>
2026
>
26_0519_PWETC_Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/20/2026 11:08:58 AM
Creation date
5/20/2026 11:07:48 AM
Metadata
Fields
Template:
Commission/Committee
Commission/Authority Name
Public Works Commission
Commission/Committee - Document Type
Agenda/Packet
Commission/Committee - Meeting Date
5/19/2026
Commission/Committee - Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ROSEVILLE COMMUNITY DEVELOPMENT ACTIVITY REPORT <br />UPDATED: 4/14/2026 <br />Project Name <br />Address <br />Project Description <br />Applicant/Owner Information <br />Starting <br />The Enclave <br />201-261 McCarrons PI <br />20 detached townhomes (12 completed-8 lots remain) <br />Multiple <br />Summer 2021 <br />Residential New Construction <br />2164 Eustis St <br />New single family home <br />Mike Torkelson Development <br />Winter 2024 <br />Residential New Construction <br />2976 West Owasso Blvd <br />New single family home <br />TJB Homes <br />Winter 2026 <br />Residential New Construction <br />2050 Eldridge <br />New single family home <br />Lee Homes <br />Winter 2026 <br />RESIDENTIAL <br />Residential New Construction <br />649 Heinel Dr <br />New single family home <br />Croix Custom Homes <br />Summer 2025 <br />Residential New Construction <br />595 Heinel Dr <br />New single family home <br />Lee Homes <br />Winter 2026 <br />Residential New Construction <br />1925 South Gluek Ln <br />New two family dwelling <br />Cara Builders <br />Spring 2025 <br />Residential New Construction <br />560 Ryan Ave <br />New single family home <br />Structural Buildings of MN <br />Summer 2025 <br />Villas of Reservoir Woods new homes <br />699/707 Shryer Ave, 692/700/708 Skillman Ave <br />New single family home <br />Cara Builders LLC <br />Summer 2025 <br />Abercrombie & Fitch <br />1595 Highway 36 #400 <br />Interior Alteration <br />TBD (In plan review) <br />Spring 2026 <br />Pottery Barn <br />1595 Highway 36 #1600 <br />New fagade and interior alteration <br />McGough Construction (In plan review) <br />Spring 2026 <br />Apple Store Breakroom Shell Space <br />1595 Highway 36 #130 Er <br />Shell space for new breakroom <br />P.R.M. Contracting <br />Summer 2025 <br />Blastoff Play Park <br />2325 Prior Ave <br />Indoor playground, arcade, restaurant and bar <br />Chan Consulting LLC <br />Spring 2026 <br />RETAIL <br />Vacant Tenant <br />1595 Highway 36 #170 <br />Tenant Remodel <br />P.R.M. Contracting <br />Fall 2025 <br />Ding Tea <br />2401 Fairview Ave <br />Interior Alteration <br />Tran Construction and Remodeling <br />Fall 2025 <br />Twin Lakes Building <br />2033 Twin Lakes Pkwy <br />New Construction Shell Building <br />Sherburne Slater Construction (In plan review) <br />Fall 2025 <br />Twin Lakes Building B <br />2037 Twin Lakes Pkwy <br />New Construction Shell Building <br />Sherburne Slater Construction (In plan review) <br />Spring 2026 <br />Von Maur Ramp <br />1595 Highway 36 <br />Ramp Repair <br />Cy -Con Inc <br />Fall 2025 <br />MnDOT Waters Edge <br />1500 County Road B2 <br />Mechanical upgrades <br />Versacon Inc <br />Fall 2023 <br />Eaglecrest <br />2945 Lincoln Dr <br />Interior Alteration <br />MRI, Inc <br />Spring 2026 <br />Adapt Health <br />2215 Highway 36 <br />Interior Alteration <br />The Bainey Group Construction <br />Spring 2026 <br />Horton Inc. <br />2565 Walnut St <br />Interior Alteration <br />Bauer Design Build (In plan review) <br />Summer2025 <br />Hamline Automotive <br />2150 Hamline Ave <br />Addition <br />Sherburne Slater Construction(in plan review) <br />Spring 2026 <br />Former Dept of Education building <br />1500 Highway 36 <br />Full demolition <br />JE Dunn Construction <br />Spring 2026 <br />NON-RETAIL/OFFICE <br />Old Dutch <br />2375 Terminal Rd <br />Solar panels <br />Blue Horizon Energy <br />Spring 2026 <br />Omni Health <br />1970 Oakcrest Ave <br />Interior Alteration— Mental Health Clinic <br />Fixed Assets, Inc <br />Spring 2026 <br />Fed Ex <br />2323 Terminal Rd <br />Full demolition <br />Veit and Companies <br />Spring 2026 <br />Temple of Hmongism <br />2351 Rice St <br />Interior Remodel <br />Elleven Construction MN <br />Summer 2025 <br />Hand in Hand Montessori <br />211 North McCarrons Blvd <br />Greenhouse/Shed Install <br />Vanguard Builders Inc <br />Summer 2025 <br />Presbyterian Homes & Services <br />2925 Lincoln Dr <br />Interior Remodel <br />Maintenance Repairs & Installations <br />Fall 2025 <br />here] <br />Page 9 of 90 <br />
The URL can be used to link to this page
Your browser does not support the video tag.