Laserfiche WebLink
<br />City of Roseville <br /> <br />Schedule of Fees and Charges for Service <br />Effective January 1,2005 <br /> <br />(minimum charge - one-half hour) <br />Additional plan review required by changes, additions <br />or revisions to plans.. .. . . . .. . . . . . . . .. . . .. . . .. . . . .. . .. .. . .. . .. . . .. . . .. . . .. . . . . . .. .$48.41 per hour <br />(minimum charge - one-half hour) <br />For use of outside consultants for plan checking, inspections <br />and similar costs..... ......... ......... ............ .................. ................. ............ ......... .Actual costs 1 <br /> <br />] Actual costs include administrative and overhead costs. <br /> <br />Demolition Permit Fee: <br />Tenant improvement/remodeling prior to building permit <br />Structures not connected to utilities <br />Structures connected to city utilities <br /> <br />$51.50 <br />$51.50 <br />$103.00 <br /> <br />Electrical Permit Fee: <br />Set through yearly contract with Contract Electrical Inspector <br /> <br />Fire Safety Inspection Fee: <br />An amount equal to eight percent (8%) of the amount determined by the Building Permit Fee <br />(except for single-family dwellings) to be charged and used to defray the cost of fire safety <br />inspections (Ord. 1237,3-13-2000, eff. 5-1-2000) <br /> <br />Grading/Excavation Permit Fee: <br /> <br />Grading Plan Review Fee <br /> <br />50 cubic yards or less....................................................................... ...No fee <br />51 to 100 cubic yards or less......... ........................... ......................... .....$24.20 <br />101 to 1,000 cubic yards..................................................................... .$38.1l <br />l,OOl to 10,000 cubic yards............ ........................ .......................... .....$50.72 <br />10,001 to 100,000 cubic yards - $50.72 for the first 10,000 cubic yards, plus $25.24 for <br />each additional lO,OOO yards or fraction thereof. <br />100,001 to 200,000 cubic yards - $277.84 for the first 100,000 cubic plus $13.65 for each <br />additional 10,000 cubic yards or fraction thereof. <br />200,001 cubic yards or more - $414.32 for the first 200,000 cubic yards, plus $7.47 for <br />each additional 10,000 cubic yards or fraction thereof. <br />Other Fees: <br />Additional plan review required by changes, additions or revisions to approved plans <br />(minimum charge - one-half hour). ................................... ...............$52.00 per hour <br /> <br />5 <br />