Laserfiche WebLink
<br />City of Roseville <br /> <br />Schedule of Fees and Charges for Service <br />Effective January 1, 2005 <br /> <br />G d' P 't F <br /> <br />ra mg erml ee <br />50 cubic yards or less............................... ........................................ ...$24.20 <br />5l to lOO cubic yards.. . .. . . .. . . .. . . .. . .. .. .. .. .. . .. . .. .. . .. . .. .. .. .. . .. . .. . . .. .. . .. .. . . .. . .. ..$3 8.11 <br />101 to 1,000 cubic yards - $38.11 for the first 100 cubic yards, plus $18.02 for each <br />additional lOO cubic yards or fraction thereof. <br />1,001 to 10,000 cubic yards ~ $200.33 for the first 1,000 cubic yards, plus $14.94 for <br />each additionall ,000 cubic yards or fraction thereof. <br />10,001 to lOO,OOO cubic yards - $334.75 for the first 10,000 cubic yards, plus $67.98 for <br />each additional 1 0,000 cubic yards or fraction thereof. <br />100,001 cubic yards or more - $946.57 for the first 100,000 cubic yards, plus $37.60 for <br />each additionall 0,000 cubic yards or fraction thereof. <br />Other Inspections and Fees <br />l. Inspections outside of normal business hours............................. .$52.00 per hour <br />(minimum charge - one-half hour) <br />2. Reinspection fees... .. . .. .. .. . .. . . . . .. . . .. . .. .. . . . .. . .. . .. . . . . .. . . .. . .. . .. . . . .. . $ 5 2.00 per hour <br />3. Inspections for which no fee is specifically indicated... . . . ... ........ . .. . $52.00 per hour <br />(minimum charge - one-half hour) <br /> <br />Investigation Fee: Work without a Permit <br />Whenever any work for which a permit is required from the city has been commenced without <br />first obtaining said permit, a special investigation shall be made before a permit may be issued <br />for such work. An investigation fee, in addition to the permit fee, shall be collected whether or <br />not a permit is then or subsequently issued. The investigation fee shall be equal to the amount of <br />the permit fee required by this code. The payment of such investigation fee shall not exempt any <br />person from compliance with all other provisions of this code nor from any penalty prescribed by <br />law. <br /> <br />Manufactured Home Permit Fee: <br />New installation <br /> <br />$154.50 <br /> <br />Mechanical Permit Fee: <br />Residential <br />Air conditioning - new <br />Air conditioning - replacement <br />Wann air furnace - new <br />Warm air furnace - replacement <br />Hot water boilers ~ new <br />Hot water boilers - replacement <br />Unit heaters <br />Swimming pool heaters <br />Miscellaneous work & gas piping <br /> <br />$36.00 <br />$36.00 <br />$77 .25 <br />$41.20 <br />$77 .25 <br />$41.20 <br />$41.20 <br />$41.20 <br />1.25 % of estimated job cost <br /> <br />6 <br />