Laserfiche WebLink
<br />150 <br /> <br />linkage or by change in furnace pressure. The operating medium may be steam, <br />electricity, air or hydraulic. If the 'gas contr&l goes to open position upon <br />failure of operating medium, thena means for shutting off the gas supply upon <br />the failure of the operating medium must be provided. <br /> <br />SECTION 3-13.3 <br /> <br />Where quick opening or slow opening gas control valve is connected <br />to an inlet shutter on gas burner, the air inlet shutter or louvre only must <br />be so designed or counter-balanced as to drop to full open position in the <br />event o,t breakage or failure of connecting mechanism. When the control is of <br />the modulating type that operates the air inl..et shutter or louvre only, shutter <br />or louvre must be so designed and counterbalanced as to drop to full open <br />position upon the failure or breakage of ~onnecting linkage. The uptake or <br />outlet damper must have an indicator or pointer visible to the operator to <br />show the position of the damper in relation tQ open and closed position. <br />Remote indicators are permitted where necessar,y. <br /> <br />SECTION 3-14 DRAFT REGULATOR: <br /> <br />When uptak.e damper is set in a fixed position such as will be used with <br />"on" or "off" control or the modulating type that operates only the air louvres <br />on the burner, a draft regulator must be used. . This regulator shall be of the <br />type that will reverse and open to the boiler room in the event of down or <br />back drafts. Where control that operates the damper is used, or induced or <br />forced draft fan or both is used, it shall be optional as to the use of a <br />draft regulator. Draft hood or diverter is not permissible. <br /> <br />SECTION 3-15 COMBUSTION INSTRUMENTS. <br /> <br />All gas burner installations in steam boilers with an input exceeding <br />2500 ft. of gas per hour shall be equipped with indicating gauges for furnace, <br />windbox and uptake draft to show combustion conditions and with flue gas <br />analysis equipment of portable or fixed type. On installations exceeding <br />20,000 cu. ft. gas input per hour, equipment shall be installed for continuous <br />indication or recording of carbon dioxide~ oxygen or air flow-steam flow. <br /> <br />SECTION 3 - 16 PIPING: <br /> <br />All,piping connections for bas burners under this section of the <br />ordinance shall be properly sized for the design maximum load with a total <br />pressure drop permissible under the particular conditions of the application. <br /> <br />SECTION 3-17 INSTALLATION DRAWING: <br /> <br />On all installations with an input capacity -in excess of 1,000,000 BTU <br />per hour, the contractor shall submit to the Buildings Inspector with his <br />request for a permit a detail drawing made by the burner manufacturer shuwing <br />method of installing burner, recommended furnace construction including floor <br />insulation, control assembly along with piping details, pipe sizes, valve <br />sizes, type and make of control if of the uptake damper operating type. If <br />this is to be furnished by someone other than the burner manufacturer, he <br />must show this as it will be applied to his burner. This drawing must be one <br />that is made up for the specific job and cannot be what is knowl\as a typical <br />installation nor a marked up drawing of some similar installation with changes <br />to suit the job in question. This drawing must have a drawing number as well <br />as a title listing the name of the job to which it applies. It is desirable <br />