My WebLink
|
Help
|
About
|
Sign Out
Home
ord_217
Roseville
>
City Council
>
City Council Ordinances
>
0200
>
ord_217
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2007 9:03:53 AM
Creation date
4/22/2005 12:50:39 PM
Metadata
Fields
Template:
Roseville City Council
Document Type
Council Ordinances
Ordinance #
217
Ordinance Title
An ordinance establishing specifications for all streets hereafter constructed within the Village of Roseville; providing for the use of certain materials and providing for the manner in which said streets shall be constructed.
Ordinance Date Passed
6/12/1956
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />(4) Section 1357 LilhtlttU.~ft9u, S..l C.a~. <br />The bituminou8 leat coat shall be con.tructed 1n accordance <br />w1th the material and construction requirement. of Section 'J~7, except: <br />Ca) The bituminoua mlter!a1 shall be any of the ..terial. <br />li.ted 1n 235'.2A ind .hall be applied at the rate de.lgnated by the <br />Engineer within the ranse of 0.10 gallon to 0.12 gallon, depending on <br /> <br />t",...4~.J <br /> <br />the cb.J:.~~o. of the eaver aggregAte. <br /> <br />(b) The assregate shall conform to the requirements of <br />Section 3127 for FA-l and.hal1 be spread at the rate de.lgnated by the <br /> <br />Engineer within the range of 8 pounds to 12 pounds per square inch. <br />Application of the aggregateehaUfollow application of the bituminou8 <br /> <br />material by not more than 5 minutes. <br /> <br />(c) The flnal rolUng shall be completed not later than <br />20 minute. after the aggregate is spread. <br /> <br />(5) ~~ctlon 2535 Bituminous Curb. <br /> <br />The bituminous curb shall eonform tD the erou section shOWl\ <br /> <br />in the plans and shall be constructed in accordance with the material <br />an. construction requirements of Section 2535. except: <br />(a) The bituminous material fo~ the mixture Ihall be <br /> <br />At-I. 85-100 penetration. The percentage by weight of th. bituminous <br /> <br />..terial 1n the mixture shan be aadirected by the Engineer within <br />the range of 5.0 to 5.8. depending on the character of the aggres_te. <br />(b) The aggregate shall conform to the requirements of <br /> <br />Sectioa 3139 for BA-2. <br /> <br />v <br /> <br />SECTION 5. ~Ag. <br /> <br />Where considered necessary to lnlure adequate dra1nas. of any <br />atreet hereafter constructed ift the Village of Rosevil1.. th. Villas. <br />Engineer shall designate location. and specifications for culverts and <br /> <br />dry well.. <br />SECTION 6. EASEMENTS. <br /> <br />._~ __. _ ......__ __~__L" __. ___......... __ ...._....._ .....a....... .1"'ft........ <br />A._ _ _ ,_... ,___ ___:a.... __ - ....__ ~_ ___ """"__ _-....:-... _ _'la,___11 \a_ .....".......aA <br />
The URL can be used to link to this page
Your browser does not support the video tag.