My WebLink
|
Help
|
About
|
Sign Out
Home
ord_217
Roseville
>
City Council
>
City Council Ordinances
>
0200
>
ord_217
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2007 9:03:53 AM
Creation date
4/22/2005 12:50:39 PM
Metadata
Fields
Template:
Roseville City Council
Document Type
Council Ordinances
Ordinance #
217
Ordinance Title
An ordinance establishing specifications for all streets hereafter constructed within the Village of Roseville; providing for the use of certain materials and providing for the manner in which said streets shall be constructed.
Ordinance Date Passed
6/12/1956
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />(d) To el~in.te the du.t null.noe, the alxiftS pl~t <br />ahall be equipped with proper hou.in,s for conveyora, acreen., <br />mixer., etc., end an approved type of du.t collectins .yat.. of <br />adequate capacity. Dust collecto~. .hall be '0 constructed a. to <br />~8te or return any part or all of the dust to the hot elevator, a. <br /> <br />""31 <br />. , <br /> <br />(-..., <br /> <br />directed by tbe Engineer. <br />The plant shall be 10 operated that the amount of <br /> <br />amoke will be reduced to . mintmum. <br /> <br />(.) Before May 15 and after September 15 of any year, <br />and at all other times when in the opinion of the Engineer, the <br /> <br />length of haul will cause excelsive 1086 of beat in the mixture. <br /> <br />all truck boxes used for hauling mixtures shall be insulated with <br />insulatins material not less than 1/2 inch thick. <br />(f) The placement of each course shall be completed <br />over the full width of the .ection under construction on each day'. <br /> <br />run. <br /> <br />(g) The rolling equipment for each opera.ing paver <br />ahall consist of not less than 2 aelf-propelled steel Wheeled <br />rollers) at least one of which shall be of the tandem type. When <br />the amount of bituminous mixture placed by one paver exceed. 120 <br />ton, per hour, 3 rollers will be required at that paver. All roller. <br />ahall exert a pressure of not le8s than 250 pound I per linear inch <br /> <br />on the rear roll. <br /> <br />v <br /> <br />(h) The plant-mixed bituminous mixtures may be placed <br />in the Fall after October 1st only on the condition that, in addi- <br />tion to all other requirements, each layer shall be compacted by <br />two complete coverages of a self-propelled pneumatic-tired roller <br />weighing not less than ZOO pounds per inch of rolling width. Such <br />rolling shall be accomplilhe4 between tbe initial and final rolllng. <br />.pecifled to be done by the Iteel wheeled rollers. <br />
The URL can be used to link to this page
Your browser does not support the video tag.