Laserfiche WebLink
<br />For the installation of each incinerator up to 2 bu. size the <br />permit fee charge shall be $3.00 and over 2 bu. size $3.00 plus <br />$1.00 for each additional bu. or fractional portion thereof. <br /> <br />For the installation of each electrical heating unit the permit <br />fee charge shall be $5.00 for each installation involving B.T.U. <br />input of 400,000 B.T.D. or less and a fee of $5.00 plus $1.00 for <br />each additional 100,000 B.T.U. input capacity or a fractional <br />portion .thereof. <br /> <br />For the inst,allation of each mechanical air conditioning or <br />ventilating system the perrnit fee charge shall be l'}'6 of 'the actual <br />installation value up -to :;;30,000.00 and over $30,000.00 1% of the <br />value up to $30,000.00 plus ~ of 1% of the value over $30,000.00. <br /> <br />32.140. Sheet Hetal viork. For the installation of any general <br />sheet metal work, the permit fee charge shall be $2.00 for the first <br />$500. market value cost or fractional part thereof. For each addi- <br />tional $400. market value cost or fract.ional part thereof, the <br />permit fee charge shall be $1.00. <br /> <br />32.200. Swinuning and I'ladinq Pools. No swirn!uing or wadJ.ng pools <br />shall be installed wi-thout first obtaining a permit. The permit <br />fee charge Eor a swinulling or vlading pool of up to 30,000 gallon <br />capaclty shall be $12.50 and for a swinuning or wading pool of over <br />30,000 gallon capacity shall be $12.50 plus $5.00 for each additional <br />10,000 gallons or fractional portion thereof. <br /> <br />II. <br /> <br />Section 32.070 and 32.030 are deleted and the following is sub- <br />stituted in place thereof: <br /> <br />32.070. Electrical. Those portions of Minnesota statutes, <br />Chapter 326, hereina~ter enumerated, are hereby adopted by reference <br />together with all amendments thereto: 326.01, Subd. 2., Subd. 3., <br />Subd. 4., Subd. 5., Suhd. 6., 6.a.; 326.24; 326.25; 326.26; 326.27; <br />326.23; 326.29; 326.31; 326.32. <br /> <br />32.080. Electrical Inspection Fee Schedule. <br /> <br />All inspections shall be recorded on official certificate- <br />affidavit plus description of work to be covered, geographical <br />location, identification of all parties involved, and fees as herein <br />prescribed. <br />