Laserfiche WebLink
<br />-8- <br /> <br />32.110. Heating. <br /> <br /> <br />(l) Oil Burner or Oil Burner Equipment. <br /> <br />For the installation of an oil burner or <br /> <br />oil burning equipment the permit fee charge shall be at the rate <br /> <br />of $7.50 for the first 10 0,000 BTU input capacity or fraction thereof, <br /> <br />plus $l.25 for each additional 100, 000 BTU per hour input or fraction <br /> <br />thereof. <br /> <br />In no ca se shall the permit fee for an oil <br /> <br />burner installation exceed $l25. 00. Where standby or dual fuel <br /> <br />burners are provided for one installation and the applications for <br /> <br />both gas and oil burners are made simultaneously, the maximum com- <br /> <br />bined permit fee for each set of gas and oil burners shall not exceed <br /> <br />$200.00. <br /> <br />(2) Oil Burner Alterations, Repairs or <br /> <br />Additions. <br /> <br />For any alterations, repairs or additions to <br /> <br />any existing oil burner or oil burning equipment, the permit fee charge <br /> <br /> <br />shall be made at the rate of $5.00 for the first $500.00 or fraction <br /> <br /> <br />thereof, plus $2.00 for each additional $500.00 or fraction thereof <br /> <br /> <br />of the total market value of such alterations, repairs or additions. <br />