My WebLink
|
Help
|
About
|
Sign Out
Home
ord_916
Roseville
>
City Council
>
City Council Ordinances
>
0900
>
ord_916
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2007 9:04:46 AM
Creation date
4/22/2005 1:00:44 PM
Metadata
Fields
Template:
Roseville City Council
Document Type
Council Ordinances
Ordinance #
916
Ordinance Title
An ordinance amending Section 32.101 of the city code of the City of Roseville providing for new permit rates.
Ordinance Date Passed
12/20/1982
Ordinance Date Published
12/29/1982
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />CITY OF ROSEVILLE <br />ORDINANCE NO. 916 <br /> <br />AN ORDINANCE AMENDING SECTION 32.101, OF THE CITY CODE OF THE CITY <br />OF ROSEVILLE PROVIDING FOR NEW PERMIT RATES. <br /> <br />The City Council of the City of Roseville does hereby ordain: <br /> <br />Section 32.101 of the City Code of the City of Roseville is hereby <br />amended to read as follows: <br /> <br />32.101. Inspection fees. Inspection fees shall be paid according <br />to the following schedule: <br /> <br />(a) Minimum fee for each separate inspection of an installation, <br />replacement, alteration, or repair limited to one inspection only - $10.00. <br /> <br />(b) Services, changes of service, temporary services, additions, <br />alterations, or repairs on either primary or secondary services shall be <br />computed separately. <br /> <br />o to 100 ampere capacity - $15.00 <br />101 to 200 ampere capacity - $18.00 <br />For each additional 100 ampere capacity or fraction thereof - $8.00 <br /> <br />(c) Circuit, installations of, additions, alterations, or repairs <br />of each circuit or sub-feeder shall be computed separately including <br />circuits fed from sub-feeders and including the equipment served, <br />except as provided for in items (d) through (k). <br /> <br />o to and including 30 ampere capacity - $4.00 <br />(maximum number of 0 to 30 ampere circuits to be paid on <br />is 30 in anyone cabinet). <br />31 to and including 100 ampere capacity - $6.00 <br />For each additional 100 ampere capacity or fraction thereof - $3.00 <br /> <br />(d) Maximum fee on a single family dwelling shall not exceed $60.00 <br />if not over 200 ampere capacity. This includes service, feeders, circuits, <br />fixtures, and equipment. <br /> <br />The maximum fee provides for no more than two rough-in inspections <br />and the final inspection per dwelling. Additional inspections at <br />the reinspection rate. <br /> <br />(e) Maximum fee on an apartment building shall not exceed $30.00 <br />per dwelling unit for the first 20 units and $25.00 per dwelling unit <br />for the balance of the units. A two-unit dwelling (duplex) maximum <br />fee per unit as per single family dwelling. <br /> <br />(f) The maximum number of 0 to 30 ampere circuits to be paid <br />on anyone athletic field lighting standing is 10. <br />
The URL can be used to link to this page
Your browser does not support the video tag.