My WebLink
|
Help
|
About
|
Sign Out
Home
ord_916
Roseville
>
City Council
>
City Council Ordinances
>
0900
>
ord_916
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2007 9:04:46 AM
Creation date
4/22/2005 1:00:44 PM
Metadata
Fields
Template:
Roseville City Council
Document Type
Council Ordinances
Ordinance #
916
Ordinance Title
An ordinance amending Section 32.101 of the city code of the City of Roseville providing for new permit rates.
Ordinance Date Passed
12/20/1982
Ordinance Date Published
12/29/1982
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />(9) In addition to the above fees: <br /> <br />(1) A charge of $1.00 will be made for each street <br />lighting standard. <br /> <br />(2) A charge of $2.00 will be made for each traffic signal <br />standard. Circuits originating within the standard will not <br />be used when computing fees. <br /> <br />(h) In addition to the above fees all transformers and <br />generators for light, heat, and power shall be computed separately at $5.00 <br />per unit plus 25~ per KVA up to and including 100 KVA, 101 KVA and over <br />at 20~ per KVA. The maximum fee for any transformer or generator <br />in this category is $50.00. <br /> <br />(i) In addition to the above fees, all transformers for signs and <br />outline lighting shall be computed at $4.00 for the first 500 VA or fraction <br />thereof per unit; plus 40~ for each additional 100 VA or fraction thereof. <br /> <br />(j) In addition to the above fees (unless included in the maximum <br />fee filed by the initial installer) remote control, signal circuits, and <br />circuits of less than 50 volts shall be computed at $3.00 per each 10 <br />openings or devices of each system plus $1.00 for each additional 10 or <br />fraction thereof. <br /> <br />(k) In addition to the above fees, the inspection fee for each <br />separate inspection of a swimming pool shall be computed at $15.00. <br />Reinforcing steel for swimming pools requires a rough-in inspection. <br /> <br />(1) For the review of plans and specifications of proposed <br />installations, there shall be a minimum fee of $100.00 up to and <br />including $30,000.00 of electrical estimate, plus 1/10 of 1% of any <br />amount in excess of $30,000.00 to be paid by persons or firms requesting <br />the review. <br /> <br />(m) When reinspection is necessary to determine whether unsafe <br />conditions have been corrected and such conditions are not subject of <br />an appeal pending before any court, a reinspection fee of $10.00 may <br />be assessed in writing by the inspector. <br /> <br />(n) For inspections not covered herein, or for requested special <br />inspections or services, the fee shall be $17.00 per man hour, including <br />travel time, plus 20~ per mile traveled, plus the reasonable cost of <br />equipment or material consumed. <br /> <br />This section is also applicable to inspection of empty conduits and <br />such other jobs as determined by the city. <br /> <br />(0) For inspection of transient projects including but not limited <br />to Carnivals and Circuses and the inspection fees shall be computed <br />as follows: <br /> <br />Power supply units according to item (b) of Fee Schedule. A like <br />fee will be required on power supply units at each engagement during <br />the season, except that a fee of $17.00 per hour will be charged for <br />additional time spent by the inspector, if the power supply is not ready <br />
The URL can be used to link to this page
Your browser does not support the video tag.