My WebLink
|
Help
|
About
|
Sign Out
Home
pm_680904
Roseville
>
Commissions, Watershed District and HRA
>
Planning Commission
>
Minutes
>
196x
>
1968
>
pm_680904
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2007 3:31:42 PM
Creation date
12/15/2004 6:30:26 AM
Metadata
Fields
Template:
Commission/Committee
Commission/Authority Name
Planning Commission
Commission/Committee - Document Type
Minutes
Commission/Committee - Meeting Date
9/4/1968
Commission/Committee - Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Re!:.,JUlar j,leeting - Roseville Planning Commission <br />Wednesday - September 4, 1968 - 7: 30 P.M. <br /> <br />fvi;}mbers present: <br />~mbers absent: <br />Also present: <br /> <br />~mbrez, Anderson, Del1X>s, Edlund, Pope and Remsburg <br />Carpenter <br />Dahlgren, Grauel and Goldberg <br /> <br />It was moved by Remsburg and seconded by Edlund that we accept the minutes of the meeting <br />of August 7, 1968, as submitted. Roll Call: unanimous. <br /> <br />Subject File 466-68 - Chandler Wilbert Vault Company request for variance in parking <br />setback at 2280 North Hamline Avenue <br /> <br />Mr. Bud Chandler and Hr. Ridder spoke for the granting of this variance. When the high- <br />way department takes the land on the west side of 01aooler's they will lose most of their <br />parking. They want to put the lot in back and have it large enough for about 55 cars. <br />Tnis would IOOal1 encroachment on the setback required. The Public Works Director's rreIJlO <br />of September 3, 1968, stated that when the interchange at Highway 36 and Hamline is awarded, <br />the following construction would take place: <br /> <br />1. Upgrade Hamline Avenue between County Road B and B-2. (Joint Village-County <br />project) <br />2. Construct storm sewers on Hamline Avenue bebveen County Road B and B-2. <br />(Joint Village-County project) <br />3. The construction of interchange will necessitate a substantial lowering of the <br />grade of TH 36 and its ditches in the area of Hamline and Dellwood Avenues. <br />Also, the M.H.D. will be installing the necessary culvert to provide an outlet <br />for drainage south of TH 36 and west of Dellwood. The lowering of the ditch will <br />provide a ten (10') foot difference in elevation between the ditch and the low <br />area in question. At present there is about a one (1') foot difference. <br /> <br />Mr. Kurcott, Mr. Willis, Mr. Art Biszang and Mr. Paulos spoke at the hearing. Their con- <br />cern was with the large variance requested and the drainage problem. Pictures were pro- <br />duced showing the water standing up to their garages and also covering the subject property 0 <br />They had counted cars and come up with only 36 to 39 cars around the plant. Mr. Chandler <br />stated that he would be willing to accept a variance of 20' on the east and a la' variance <br />on the west. The Commission was worried about the water situation for the coming year be~ <br />fore 111 36 could be lowered. Also what would happen if the proposed 18" storm sewer on <br />the east end of this property wasn't installed. After discussion <br /> <br />It was roved by Remsburg and seconded by Edlund that we recomrrend to the Council that they <br />deny this request for variance. Roll Call: Ayes (5) - Nays (1) - M3mbrez opposing. <br /> <br />SUbuect File 468-68 - Eva Mogren's request for division of Government Lot 9, 2824 Lakeview. <br /> <br />Mr. M:>gren and his grandson didn't present any further plans other than the one they <br />presented at the last hearing. Discussion centered on the dedicating of land for the roads <br />and the improvement of this road. Also the land locking of the one lot that Mr. Mcgren's <br />house is on now. Mr. O'Brien, Mr. Broemen, Mr. Seleniske, Mr. Tedra and Mr. Barrett spoke <br />at the hearing. They were interested in what their cost would be if this road were to be <br />improved. It appeared that they didn't want any assessments against their property. They <br />stated that they were satisfied with the road as it is now. After discussion, <br /> <br />It was moved by Demos and seconded by Remsburg that we recorrmend to the COtmcil that they <br />approve the 6 lot plan #3 dated September 4, 1968. subject to a dedication of 20' on <br />Orchard Lane and a dedication of 10' on Lakeview and that the improvements for Orchard <br />Lane on the north line of Mr. Mogrens property be assessed 75% to Mr. Mogrens property and <br />25% to the other benefitted property owners. Roll Call: unanimous. <br />
The URL can be used to link to this page
Your browser does not support the video tag.