My WebLink
|
Help
|
About
|
Sign Out
Home
pm_950412
Roseville
>
Commissions, Watershed District and HRA
>
Planning Commission
>
Minutes
>
199x
>
1995
>
pm_950412
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2007 3:34:27 PM
Creation date
12/15/2004 7:55:59 AM
Metadata
Fields
Template:
Commission/Committee
Commission/Authority Name
Planning Commission
Commission/Committee - Document Type
Minutes
Commission/Committee - Meeting Date
4/12/1995
Commission/Committee - Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Member Thomas also recommended that, as the city studies the County Road C and B2 <br />widths, it should consider the need for bike paths and pathways along the right-of-ways. <br /> <br />There was no further comment. <br /> <br />Dennis Welsch stated that he would convey these concerns and recommendations to the <br />City Council. <br /> <br />7. <br /> <br />(b) <br /> <br />Owasso Hills Design Standards: <br /> <br />Consulting Planner, John Shardlow, and Developer, Len Pratt, representing the Owasso <br />Hills development project, provided details on the design standards to be used throughout <br />the project area. They described the following programs or activities: <br /> <br />Model construction; developer staging; status of lot holds; wetland delineations; trail <br />connections; architectural covenants; landscaping specifications; lighting standards; entry <br />signage; and definitions of compatibility. <br /> <br />Chairman Keith Wietecki asked for an explanation of the contaminated land on the site <br />and the construction phasing for the project. John Shardlow responded that the <br />contaminated sites have been determined and will be cleaned up in the near future. <br />Constructing phasing is changing and may occur all at one time because of the high <br />demand for the sites. There was no further comment. <br /> <br />9. ADJOURNMENT: <br /> <br />The meeting adjourned at 9:35 p.m. <br /> <br />6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.