My WebLink
|
Help
|
About
|
Sign Out
Home
pm_980527
Roseville
>
Commissions, Watershed District and HRA
>
Planning Commission
>
Minutes
>
199x
>
1998
>
pm_980527
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2007 3:35:14 PM
Creation date
12/15/2004 7:56:33 AM
Metadata
Fields
Template:
Commission/Committee
Commission/Authority Name
Planning Commission
Commission/Committee - Document Type
Minutes
Commission/Committee - Meeting Date
5/27/1998
Commission/Committee - Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Member Olson asked if Willow Gate would also install sidewalk. <br />MemberWilke asked if surge parking time will cause traffic grid-lock within the <br />lot. Member Wilke also asked if the sidewalk could be escrowed. <br />MemberKlausing asked if the appearance of the fencing (cyclone) should be <br />changed to match the design. <br />Member Cunningham asked for the capacity of the school now and as <br />renovated. <br />RickHollenkamp, Kraus Anderson, stated there are 62 children, with expansion <br />room for 80, with a current waiting list of 100. The drop-off and pick-up traffic are <br />not issues. <br />RickHallenkamp asked for details of the paining of new brick. Kim Lee noted <br />that staff concern is to paint new brick and later have it peel. The existing brick <br />is rust-colored. There is a requirement for four boulevard trees based on the <br />standards of the street tree master plan (staff will work with the developer). <br />There being no further comment, Chair Harms closed the hearing. <br />Motion: <br /> Member Wilke moved, Member Mulder seconded, to recommend <br />approval of the request for an amended Conditional Use Permit to allow the <br />expansion of a day care facility at 1875 Perimeter Drive, based on the staff <br />findings and conditions; staff to review street trees and work with applicant on <br />brick and facade, and condition of screen/cyclone fence. <br />MemberKlausing asked for inclusion of new fencing in areas where it is in bad <br />condition. <br />Member Cunningham expressed concern with the need for safety and visibility <br />from the street with a chain link fence. The fence, however, does catch litter. <br />Motioncarred 7-0. <br />Roll Call: Ayes: Wilke,Mulder, Harms, Cunningham, Rhody, Olson, Klausing <br />Nays: None <br />7c.Planning File 2995. Presbyterian Homes Housing and Assisted Living, Inc., <br />a request to amend a Planned Unit Development to increase the size of the <br />building approved for this parcel for the purpose of constructing a 32,900 <br />square foot residential dementia facility (EagleCrest - 2965 Lincoln Drive). <br />10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.