My WebLink
|
Help
|
About
|
Sign Out
Home
2003-04-24_PWETC_AgendaPacket
Roseville
>
Commissions, Watershed District and HRA
>
Public Works Environment and Transportation Commission
>
Agendas and Packets
>
200x
>
2003
>
2003-04-24_PWETC_AgendaPacket
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/22/2010 3:00:15 PM
Creation date
6/16/2005 1:58:52 PM
Metadata
Fields
Template:
Commission/Committee
Commission/Authority Name
Public Works Commission
Commission/Committee - Document Type
Agenda/Packet
Commission/Committee - Meeting Date
4/24/2003
Commission/Committee - Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />RosevilIe Public Works and Transportation Commission <br /> <br />Agenda Item <br /> <br />Date: April 24, 2003 <br /> <br />Item No: 8 <br /> <br />Item Description: Building Project Updatc <br /> <br />At the April 7'h Council meeting, staff and the architects updated the Council on the City's <br />building project. We are now essentially at the end of the design development phase and are in <br />the final design and detailed drawing phase. We will be presenting the latest infOlmation to you <br />at the Commission meeting. We will review the proposed floor plans, site plan and construction <br />phasing plan. We will also discuss the project budget. <br /> <br />Attached are the floor plan drawings and the building elevation drawings. Wc will have 3-D <br />images of the proposed construction at the Commission meeting, which will better detail the <br />proposed exterior finishes and fit within this site. <br /> <br />The project, as currently proposed, is consistent with the goals and objectives presented to the <br />Council prior to the November, 2002, referendum. The police addition is minus a firing range, <br />as directed by Council on March 31, 2003. The maintenance building remodeling and expansion <br />of the yard area includes winter maintenance materials facility, improved storage areas, an <br />improved vehicle maintenance area, and improved office and staff arcas accessible to the public. <br /> <br />Civic Center Drive is proposed to be realigned through the site and parking areas redesigned and <br />rebuilt. <br /> <br />The police addition and maintenance building improvements are projected to be within the <br />Council authOlized not-to-exceed total cost of$IO.4 million. McGough Construction has <br />provided three estimates to date through the design development process, each bringing us closer <br />to the projcct budget. We are committed to delivering the project within budget. <br /> <br />Recommended Action: <br /> <br />Comment on the design and detail of the proposed project. <br />
The URL can be used to link to this page
Your browser does not support the video tag.