My WebLink
|
Help
|
About
|
Sign Out
Home
2005-06-28_PWETC_AgendaPacket
Roseville
>
Commissions, Watershed District and HRA
>
Public Works Environment and Transportation Commission
>
Agendas and Packets
>
200x
>
2005
>
2005-06-28_PWETC_AgendaPacket
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/22/2010 3:57:15 PM
Creation date
6/27/2005 10:11:02 AM
Metadata
Fields
Template:
Commission/Committee
Commission/Authority Name
Public Works Commission
Commission/Committee - Document Type
Agenda/Packet
Commission/Committee - Meeting Date
6/28/2005
Commission/Committee - Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
92
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />CONCLUSIONS AND RECOMMENDATIONS <br /> <br />I. CONCLUSIONS: <br />All portions of the project as proposed are feasible. <br /> <br />Estimated project cost: <br /> <br /> Reconstruction Realignment <br />Street Reconstruction $1,708,681.06 $1,907,549.64 <br />Storm Sewer $283,165.29 $302,292.09 <br />Sidewalk Construction $219,388.95 $230,154.10 <br />Utility reconstruction $231,385.10 $231,385.10 <br />Total $2,211,235.30 $2,439,995.83 <br /> <br />II. RECOMMENDATIONS: <br /> <br />I. Reconstruct S. Owasso Boulevard from Rice Street to Dale Street. <br /> <br />2. Realign S. Owasso Boulevard between Galtier and Matilda Street consistent with the <br />approved Ladyslipper Park Master Plan <br /> <br />3. Construct a sidewalk along the south and west boulevard. <br /> <br />4. The City fund the sidewalk with Municipal State Aid funds. <br /> <br />5. The City fund the utility improvements with the appropriate City Infrastructure fund. <br /> <br />6. The City fund the street reconstruction with Municipal State Aid funds and assessments <br />as detailed in this report. <br /> <br />7. Begin construction of this project in fall of2005, completion in fall 2006 as proposed in <br />this report. <br /> <br />8. Schedule a public hearing for July 11, 2005. <br /> <br />Project P-ST-SW-05-06 <br />S. Owasso Boulevard Reconstruction <br /> <br />Feasibility Report <br /> <br />9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.