My WebLink
|
Help
|
About
|
Sign Out
Home
pm_050907
Roseville
>
Commissions, Watershed District and HRA
>
Planning Commission
>
Minutes
>
200x
>
2005
>
pm_050907
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2007 3:38:16 PM
Creation date
12/27/2005 3:04:03 PM
Metadata
Fields
Template:
Commission/Committee
Commission/Authority Name
Planning Commission
Commission/Committee - Document Type
Minutes
Commission/Committee - Meeting Date
9/7/2005
Commission/Committee - Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Roseville - Planning Commission Minutes for September 7, 2005Page 2 of 10 <br />that the impacts on the subject parcel would be reduced, especially lot coverage, vehicle noise, and <br />structure massing/light infiltration to adjacent residential properties; and that single family homes, <br />even if on small lots, was a more consistent and effective use and buffer form the adjacent <br />residential (west) neighborhood. <br /> <br />Paschke explained that the proposal by United Properties consists of six single family homes on <br />1.02 acres on the west side of Fulham Street. Each residential home (except the most southern lot) <br />is proposed with a zero lot line along the southern property line and a 9 foot setback from the north <br />property line. The southern most lot is proposed with an 17 foot setback from the south property line <br />and a 9 foot setback from the north property line. Each home is designed as a single level walk-out <br />with sizes range from 3,310 sq. ft. to 3,730 sq. ft. <br /> <br />The “Final Development Plan” has established setbacks as follows: All lots will have a minimum <br />front yard setback adjacent to Fulham Street of 27 feet to either the principal structure or the <br />attached garage. Each lot will have a minimum rear yard principal structure setback of 30 feet. Side <br />setbacks will vary somewhat as shown in the chart below. <br /> <br />North <br />East Setback West Setback South Setback <br />Lot and Block Setback <br />(front)(rear)(side) <br />(side) <br />Lot 1, Block 127 feet10 feet30 feet0 feet <br />Lot 2, Block 127 feet9 feet30 feet0 feet <br />Lot 3, Block 127 feet9 feet30 feet0 feet <br />Lot 4, Block 127 feet9 feet30 feet0 feet <br />Lot 5, Block 127 feet9 feet30 feet0 feet <br />17 feet adjacent <br />Lot 6, Block 127 feet9 feet30 feet <br />to Roselawn Ave <br />The Community Development Staff recommended approval of the request by United Properties, as <br />consistent with the approved concept, subject to the following conditions: <br /> <br />a.The applicant shall work with the City Staff to finalize a landscape plan that provides <br />adequate screening from the adjacent (west) properties and eliminates impacts to the storm <br />water management plan. <br /> <br />b.Placement of mechanical units shall be along the north side of each home and screened to <br />minimize noise and visual impacts to adjacent residents. <br /> <br />c.All required utility, drainage, and ponding easements must be placed on the final plat or <br />conveyed to the city as a separate document prior to issuance of building permits for the six <br />homes. <br /> <br />d.The hours of construction and contractor/subcontractor parking must continue to be regulated <br />(through the PUD). Specifically, weekday hours would be limited to 7 a.m. to 10 p.m. and <br />weekend hours being limited to 9 a.m. to 9 p.m. (405.03D). <br /> <br />e.Prior to issuance of any building permits, the Rice Creek Watershed District and the Public <br />Works Department must approve all final grading, drainage, and storm water management <br />plans; and the Public Works Department must approve the final water and sanitary sewer - <br />utility plan. <br /> <br />f.All buildings, tree branches and roots, debris, and any soil contamination (subject to MnPCA <br />requirements) must be removed from the site (not burned on the site) prior to the issuance of <br />a building permit. <br /> <br />g.The provision of Park Dedication fee in lieu of land dedication amounting to $1,000 per unit or <br />$6,000 (as per the 2004 Park & Recreation Commission review and recommendation). <br /> <br />http://www.ci.roseville.mn.us/council/planning/minutes/2005/pm050907.htm12/27/2005 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.