My WebLink
|
Help
|
About
|
Sign Out
Home
2005-10-25_PWETC_AgendaPacket
Roseville
>
Commissions, Watershed District and HRA
>
Public Works Environment and Transportation Commission
>
Agendas and Packets
>
200x
>
2005
>
2005-10-25_PWETC_AgendaPacket
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/22/2010 4:00:00 PM
Creation date
9/11/2006 9:02:53 AM
Metadata
Fields
Template:
Commission/Committee
Commission/Authority Name
Public Works Commission
Commission/Committee - Document Type
Agenda/Packet
Commission/Committee - Meeting Date
10/25/2005
Commission/Committee - Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />5. Exceptions. <br /> <br />(a) Rule F and its requirements will not apply to development less than I acre in size for all land uses, <br />unless such development: . <br /> <br />(1) Is within the 100-year floodplain and greater than 1,000 sq. ft. <br /> <br />(2) Is within 300 feet of a public water or protected wetland and greater than 1,000 sq. ft. <br /> <br />(b) Rule F and its requirements will not apply to annually cultivated land used for farming, research, or <br />horticulture. <br /> <br />Rule G: Connections to Trout Brook <br /> <br />1. Policy. It is the policy of the Board of Managers to: <br />. Regulate new direct connections or replacement of existing connections to Trout Brook Interceptor so <br />that the connection is completed in a manner that does not compromise the integrity of the Trout Brook <br />Interceptor. <br />. Not allow new direct connections to Trout Brook Interceptor if the connection will cause or exacerbate <br />conveyance problems in the system <br /> <br />2. Regulation. A permit and stormwater management plan is required under this rule for new direct connections <br />and replacement of existing connections to Trout Brook Interceptor. <br /> <br />3. Design Criteria For Connections to Trout Brook Interceptor. <br />Connection plans must comply with the following criteria: <br />. New direct connections and replacement of existing connections will be completed using a method that <br />is approved by the District. <br />. Peak flow rate, the total volume of flow, and the timing of the flow for new connections must be <br />managed to not cause new water conveyance problems or exacerbate existing water conveyance <br />problems in the Trout Brook Interceptor. Enlargement of existing connections is considered a new <br />connection. <br /> <br />4. Required Exhibits. The following exhibits must accompany the permit application. One set, full size; two <br />sets, reduced to maximum size of 11 "x 17." <br /> <br />(a) Property lines and delineation oflands identifYing ownership. <br /> <br />(b) Proposed and existing stormwater facilities' location, alignment and elevation. <br /> <br />(c) Identification of existing and proposed site contour elevations with at least a 2-foot contour interval. <br /> <br />(d) Construction plans and specifications of proposed connection, including design details, connection <br />method, and timing of connection. <br /> <br />CRWD Draft Rules - 45 Day Review Version <br /> <br />October 6, 2005 <br /> <br />Page 12 of14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.