Laserfiche WebLink
<br />(e) Stormwater runoff volume and rate analyses for the 2-, 10- and 100-year critical events, existing and <br />proposed conditions. <br /> <br />(f) Narrative addressing incorporation of stormwater BMPs. <br /> <br />(g) On-site soil boring indicating soil type <br /> <br />Rule H: Enforcement <br /> <br />1. Violation of Rules is a Misdemeanor. Violation of these rules, a stipulation agreement made, or permit <br />issued by the Board of Managers under these rules, is a misdemeanor subject to a penalty as provided by law. <br /> <br />2. District Court Action. The District may exercise all powers conferred upon it by Minnesota Statutes Chapter <br />1030 in enforcing these rules, including criminal prosecution, injunction, or action to compel performance, <br />restoration or abatement. <br /> <br />3. Administrative Order. The District may issue a cease and desist order when it finds that a proposed or <br />initiated project presents a serious threat of soil erosion, sedimentation, or an adverse effect upon water quality <br />or quantity, or violates any rule of the District. <br /> <br />Rule J: Variances <br />1. Variances Authorized. The Board of Managers may hear requests for variances from the literal provisions <br />of these rules in instances when their strict enforcement would cause undue hardship because of circumstances <br />unique to the property under consideration. The Board of Managers may grant variances where it is <br />demonstrated that such action will be in keeping with the spirit and intent of these rules. <br /> <br />2. Standard. In order to grant a variance the Board of Managers must determine that: <br /> <br />(a) Special conditions apply to the structure or land under consideration that do not apply generally to other <br />land or structures in the District. <br /> <br />(b) Because of the unique conditions of the property involved, undue hardship to the applicant would result, <br />as distinguished from mere inconvenience, if the strict letter of the rules was carried out. Economic <br />considerations alone shall not constitute undue hardship if any reasonable use of the property exists under <br />the terms of the District's rules. <br /> <br />(c) The proposed activity for which the variance is sought will not adversely affect the public health, safety, <br />welfare, will not create extraordinary public expense, will not adversely affect water quality, water control, <br />drainage in the District. <br /> <br />(d) The intent of the District's rules is met. <br /> <br />3. Term. The term of a variance shall be concurrent with the associated pennit. <br /> <br />CRWD Draft Rules - 45 Day Review Version <br /> <br />October 6, 2005 <br /> <br />Page 13 ofl4 <br />