Laserfiche WebLink
<br />Review of Plan <br /> <br />I) <br /> <br />General. The City appoints the City Engineer to review the erosion and sediment <br />control plan to ensure compliance with the City of Roseville Erosion and Sediment <br />Control Specifications. <br />Permit required. If the City detem1ines that the erosion and sediment control plan <br />meets the requirements of this article, the City shall issue a pennit, valid for a <br />specified period oftime that authorizes the land disturbance activity contingent on the <br />implementation and completion of the erosion and sedimel1fwontrol plan. <br />Denial. If the City determines that the erosion and sedi ""'"'!'~!I"tontrol plan does not <br />meet the requirements of this article, the City shall n a permit for the land <br />disturbance activity. The erosion and sediment cOn" 0 ,an must be resubmitted for <br />:';'!<;::,I'!;:II,'II:;>:- ";'!i:il!'W1il!I'1 <br />appr~val before the land distur~ance activity s,~g41~11.,. Alllll\1C1use ar:d building. <br />permits must be suspended until the develo '., ,as an approv roslOn and sediment <br />control plan. <br />Permit suspension. If the City determj " <br />implemented according to the sched1il e contro <br />maintained, all land use and building p ,'" } mu <br />has fully implemented and maintained th;;"!!~~l1 <br />erosion and sediment cont <br /> <br />2) <br /> <br />3) <br /> <br /> <br />4) <br /> <br />Implementation and Maintenance of P <br /> <br />. . ""Ii",,!~I!!i~d sediment control pl~ shall <br />and dlstur. . ctlVlty, and' shall not be removed Without <br />.,ate ofC'~~~letion. Noncompliance with the grading and <br />.!I.II,,!I!, unds for'~tll!order fonn the City to halt all construction. <br />!!!III!I!,!I,'!II!'. <br />"'illl!!.I!", <br />The plan implementatio ! 0 wing: <br />",,(1111'1,11,,111111111. . <br />getatlOn shall be retame enever feasible. <br />an s ist:!f~!~ in increments of workable size on which adequate erosion <br />and sedimen , ,', ntrol e provided and maintained, and staged so that the area is <br />'lill:II:IUilllll' . I <br />not exposed foh:.fpltg pen of time without stabilization. <br />e location of J~~!hs not to be disturbed must be identified with flags, stakes, signs, <br />lillil:!I!II!I, . . <br />nce, e~c. be~~~~ constructIOn begms. . .. . <br />4) Do, "gradient sedIillent controls must be m place before up-gradient land dlsturbmg <br />activi~'!H""'" . <br /> <br />5) Black zi . all be used for long-tenn silt fence installation. <br />6) All stonn rams and inlets must be protected until all sources of potential discharge <br />are stabilized. <br />7) Temporary stockpiles must have effective sediment control and can not be placed in <br />surface waters or storm water conveyance systems. <br />8) Velucle tracking from the site shall be minimized with the use of stone pads, concrete <br />or steel wash racks, or equivalent systems. <br />9) Street sweeping must be used if BMPs are not adequate to prevent sediment from <br />being tracked into the street. <br /> <br /> <br /> <br />- 4- <br />