Laserfiche WebLink
<br />The applicant shall be responsible for proper operation and maintenance of all stonnwater <br />pollution controls and soil stabilization measures in conformance with best management <br />practices and with the maintenance requirements in the NPDES General Construction Pennit. <br />The applicant is responsible for the operation and maintenance of temporary erosion at the site. <br />The applicant is responsible until another applicant has assumed control over all areas of the site <br />that have not been finally stabilized or the site has undergone final stabilization, and has received <br />an approved Certificate of Completion. <br /> <br /> <br />Modification of Plan <br /> <br />An approved erosion and sediment control plan may be mod' <br />for modification to the City and subsequent approval by th <br />application, the City Engineer may require additional re .",Ih, <br /> <br />bmission of an application <br />I . In reviewing such <br />,8 and data. <br /> <br />Escrow Requirement <br /> <br />all require the pa er to escrow <br />, and maintenance of the erosion <br />e by the City Council. Upon <br /> <br />The City shall notify th <br />of this ordinance. <br /> <br />on the financial securities part <br /> <br />1) . . tial C"I"!i1ili~t will be to a party or p~ies listed on the <br />"""il"'II'~IUMtlbn control plan. Forty-eight (48) hours after <br />or seventy~~d"'(72) hours after the failure of erosion control <br />easure iche less, the City, at its discretion, may begin corrective work. <br />?rosio~ Of "'I;II;IIIII!III!, If e"i""';I~~ breaches the p~rimeter of th~ site, t~e applicant shall <br />1111l11edlately de~~~~p a cle,\W.J1p and restoratIOn plan, obtam the nght-of-entry from the <br />. oining prope~II'bwner( s~, and implement the cleanup and restoration plan within <br />'-eighty (48) ':1Iillll rs of obtaining the adjoining property owner's permission. In no <br />cas ess wri pproval is received from the City, shall more than seven (7) <br />calen a y without corrective action being taken. If, in the discretion of the <br />City, the ,," t does not repair the damage caused by the erosion, the City may do <br />the remedi;;llll~ork required and charge the cost to the applicant. <br />3) Erosion into Streets, Wetlands or Water Bodies. If eroded soils (including tracked <br />soils from construction activities) enter or appear likely to enter streets, wetlands, or <br />other water bodies, prevention strategies, cleanup and repair must be immediate and <br />entirely at the expense of the applicant. The applicant shall also pay all costs <br />associated with traffic control and flagging required to protect the traveling public <br />during the cleanup operations. <br /> <br />- 5 - <br />