Laserfiche WebLink
<br />a. Contact information for the llPplicllntpcrmitteePermittee <br />b. Project description: the nature and purpose of the land disturbing activity and <br />the amount of grading involved <br />c. Phasing of construction: the nature and purpose of the land disturbing activity <br />and the amount of grading, utilities, and building construction <br />d. Existing and proposed site conditions: existing and proposed topography, <br />vegetation, and drainage <br />e. Adjacent areas, neighboring streams, lakes, wetlands, residential areas, roads, <br />etc., which might be affected by the land disturbing ctivity <br />f. Soils: soil names, mapping units, erodibility <br />g. Critical erosion areas: areas on the site that haX otential for serious erosion <br />problems ,"1"" <br />h. Erosion and sediment control measures: ""n1ethods to bp,psed to control erosion <br />and sedimentation on the site, both d~f,i~~and after thec()llstruction process <br />1. Temporary and Permanent stabili3~ti~fiT" how the site willbpi,stabilized during <br />and after construction (is compl~t~9), including specifications <br />J. Storm water management: how*~9rm runoff~l! be managed, iric!llding <br />methods to be used if the developm~mwill"'1r~*ult in increased peak rates or <br />runoff ",1ii' <br />k. Maintenance: sched~I,~?f.rFgular inspectiggs and repair of erosion and <br />sediment control struc~fes'i ,,)), <br />1. Calculations: any that '~re mad~r()L~he desigl1pf such items as sediment <br />basins, diversions, watervyays, and mper <Ipplicable practices <br /> <br />Review of Plan <br /> <br />1) General. 'T~p,eity ~PB~i~tst1!~Sity ~h&i~eer to review the erosion and sediment <br />control plan topn*.~EF,1complianc~wjthJhe City ofRoseville Erosion and Sediment <br />ecifications. <br />ermit r.J~d. If1?FSity determines that the erosion and sediment control plan <br />meets the req~,i~F:nents8rthis article, the City shall issue a permit, valid for a <br />. specified periOC\"?r time th<lt authorizes the land disturbance activity contingent on the <br />i!!)plementation a~? completion of the erosion and sediment control plan. <br />3) D~~i91. If the Ci~~,?etermines that the erosion and sediment control plan does not <br />meett~p,requirFf~pnts of this article, the City shall not issue a permit for the land <br />disturb~PF~P~j~jty. The erosion and sediment control plan must be resubmitted for <br />approval b~r8Le the land disturbance activity begins. AJ.!-No land use and building <br />permits fffilSf-mav be suspendcd issued until the dcvcloperPermittee has an approved <br />erosion and sediment control plan. <br />4) Permit suspension. If the City determines that the approved plan is not being <br />implemented according to the schedule or the control measures are not being properly <br />maintained, all land use and building pennits must be suspended and stop work order <br />issued until the dc'.'cloperPermittee has fully implemented and maintained the control <br />measures identified in the approved erosion and sediment control plan. <br /> <br /> <br />-4 - <br />