Laserfiche WebLink
<br />Implementation and Maintenance of Plan <br /> <br />All stormwater pollution controls noted on the approved erosion and sediment control plan shall <br />be installed before commencing the land disturbing activity, and shall not be removed without <br />City approval or approval of a Certificate of Completion. Noncompliance with the grading and <br />erosion control plan shall constitute grounds for an order ffirm from the City to halt all <br />construction. <br /> <br />The plan implementation shall incorporate the following: <br />I) <br />2) <br /> <br /> <br />adequate erosion <br />so that the area is <br /> <br />3) <br /> <br />Existing vegetation shall be retained whenever feasi <br />Land shall be disturbed in increments of workable size <br />and sediment control can be provided and m aiiled, and <br />not exposed for long periods of time wit bilization. <br />The location of areas not to be disturbe t be identified with <br />silt fence, etc. before construction be <br />Down-gradient sediment controls must <br />activity begins. <br />Black zip ties shall be used for long-term <br />All storm drains and inlets must be protected <br />are stabilized. ' <br />Temporary stockpiles must have effective sediment <br />surface waters 0 water conveyance systems. <br />Vehicle trac ., 0 shall be minimized with the use of stone pads, concrete <br />or steel was racks, or systems. <br />Street sw~eping must if BMPs are not adequate to prevent sediment from <br />being tracked into the <br /> <br /> <br />sIgns, <br /> <br />4) <br /> <br /> <br />disturbing <br /> <br />up-gradient <br /> <br />5) <br />6) <br /> <br /> <br />installation. <br />sources of potential discharge <br /> <br />7) <br /> <br />and can not be placed in <br /> <br />8) <br /> <br />9) <br /> <br /> <br />PerlJ1itte shall be for proper operation and maintenance of all <br />01 u 0 cpB)rols an;4~oil stabilization measures in conformance with best <br />ent practices an%!yith th~m~intenance requirements in the NPDES General <br />Const ",}~,gn Pennit. The aBg!icantPcnRittcePennittee is responsible for the operation and <br />maintenan9,R:,,gftemporary er?,~~on at the site. The applicantpermittecPermittee is responsible <br />until another~~glieantPermiite~Permittee has assumed control over all areas of the site that have <br />not been finally~~~pilized,,?,Djj1e site has undergone final stabilization, and has received an <br />approved Certificat!i,gF 9,gi>>pletion. The Permittee is responsible for maintenance. clean-up and <br />all damages caused bvflooding of the site or surrounding area due to in-place erosion or <br />sediment control. <br /> <br />Modification of Plan <br /> <br />An approved erosion and sediment control plan may be modified on submission of an application <br />for modification to the City and subsequent approval by the City Engineer. In reviewing such <br />application, the City Engineer may require additional reports and data. <br /> <br />- 5 - <br />