Laserfiche WebLink
<br />time in which to file an appeal, the charges shall become a special <br />assessment against the property and shall constitute a lien on the <br />property for the amount of the assessment. <br /> <br />(5) Injunctive Relief. It shall be unlawful for any person to violate any <br />provision or fail to comply with any of the requirements of this Rule. If <br />a person has violated or continues to violate the provisions of this Rule, <br />the District may petition for a preliminary or permanent injunction <br />restraining the person from activities which would create further <br />violations or compelling the person to perform abatement or remediation <br />of the violation. <br /> <br />(6) Violations Deemed a Public Nuisance. In addition to the enforcement <br />processes and penalties provided, any condition caused or permitted to <br />exist in violation of any of the provisions of this Rule is a threat to <br />public health, safety, and welfare d is declared and deemed a <br />nuisance, and may be summarily' ted or restored at the violator's <br />expense, and/or a civil action t te,. oin, or otherwise compel the <br />cessation of such nuisance ma e taken. <br /> <br />(7) Relation to Other Rules. <br />Rule shall abridge or <br />provided for under Rule <br /> <br /> <br />the enforcement provisions of this <br />of the District to seek remedies <br /> <br />4. <br /> <br />EXHIBITS. The folio <br />One set, full size; one <br />electronic .pdfforma <br /> <br />ust accompany the permit application. <br />o ll"x17"; and a copy of all submittals in <br /> <br />(a) Property line <br />easements. <br /> <br />deli ation of lands identifying ownership and <br /> <br />(b) Proposed and existing stormwater facilities' location, alignment and <br />elevation. <br /> <br />(c) Identification of existing and proposed site contour elevations with at least a <br />2- foot contour interval. <br /> <br />(d) Construction plans and specifications of the proposed connection, including <br />design details, connection method, and timing of connection. <br /> <br />(e) Stormwater runoff volume and rate analysis for the 2-, 10-, and 100-year <br />critical events, existing and proposed conditions. <br /> <br />(f) Narrative addressing incorporation of stormwater BMPs. <br /> <br />(g) On-site soil boring indicating soil type. <br /> <br />06/12/2006 CRWD DRAFT <br /> <br />30 <br />