My WebLink
|
Help
|
About
|
Sign Out
Home
CC_Minutes_2007_0618
Roseville
>
City Council
>
City Council Meeting Minutes
>
200x
>
2007
>
CC_Minutes_2007_0618
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/1/2007 12:34:17 PM
Creation date
8/1/2007 12:34:15 PM
Metadata
Fields
Template:
Roseville City Council
Document Type
Council Minutes
Meeting Date
6/18/2007
Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Regular City Council Meeting <br />Monday, June 18, 2007 <br />Page 32 <br />some for their performance of the purchase agreement with the seller <br />and preliminary franchise agreement negotiations, with any required <br />environmental issues that may surface handled economically under <br />the applicant's own contingencies between them and the seller; and <br />projected time needed by the applicant to submit their revised traffic <br />study in accordance with the scope requested by staff (estimated at <br />one month), and followed by staff s and city consultant review of the <br />information. <br />Mr. Livingston reiterated his frustration with the redundancy of the <br />request; staff s lack of timeliness in clarifying the scope of the infor- <br />mation being sought; and additional time delays being encountered <br />and jeopardizing negotiations. <br />Mr. Stark noted, during the discussion, that staff was not simply seek- <br />ing information they could obtain by reviewing the standard manuals <br />themselves, but needed to determine whether Cleveland Avenue could <br />accommodate the projected trips by the applicant's demonstration to <br />staff that the transportation system, current or proposed, was sufficient <br />to accommodate the proposed project, and related to future develop- <br />ment in the area. Mr. Stark advised that it was standard operating <br />procedure for their traffic consultant to review and present the infor- <br />mation to staff, and in turn, the City's traffic consultant would cor- <br />roborate the information or make additional comment and recommen- <br />dation. Mr. Stark further noted that staff had been offering for some <br />time to sit down with the applicant's traffic engineer, reiterated as a <br />line item within the last 10 days to the applicant, even though that was <br />not something staff typically did. <br />Additional discussion included items addressed in the applicant's nar- <br />rative. <br />Councilmember Pust opined that it appeared the applicant had two op- <br />tions: 1) complete the traffic study by August 3, 2007, specifically ad- <br />dressing the right-in/right-out according to regular standards and in <br />accordance with the scope requested by staff; or 2) voluntarily delay <br />the application until the AUAR update has been completed and rely <br />on that information, understanding that additional traffic studies may <br />need to be completed once the AUAR update is received and ana- <br />
The URL can be used to link to this page
Your browser does not support the video tag.