Laserfiche WebLink
The hotel ii~i11 be a ;~ floor, on grade, 1701°oom hotel. The,jootprint of the hotel is approximately <br />18,3(}0 sc~z.rare feet fol° a total sc~zrar-e footage of 73, 000 sgzrare feet. The canstruction i~~ill be ~-mood <br />fi~anle ~nid~ partial br°ick o~° stone exterior. The restati~rant 1~~ill be a sifagle stol°y 5, 000 squa~°e faot <br />str•ucta~n°e detached fi-on~t the hotel. The tl~>o sfl°ucta~res ~~~i11 be connected by side~9~a11~s interior to the site. <br />The impe~~=ions surface iT~ill be ~~educed and stogy~m ~i~ater ~i~ill be managed on site thru surface and <br />undergo°ound tube arl°a~~s. Tandscaping, including trees and shrubs, ~~i=ill be consistent with Cit)~ <br />requirements. There are no trees cur•r•ently ors the pr°ope~°ty. The existing soils 7~~ill not be sid ~r-frcantly <br />impacted Frith ot~1y ~1~ainor grading necessa~~>,for site pr°eparation. The subsurface sthuctzn~es, such as <br />,foundations, r>>ill be consistent ~~~~idz the needs of the abol~e described sb~z~~ctul°es. l~TO under.o °oii~nd pz~blic <br />irnp~°a~~el~~lents are planned - o3~1y foundations, ~>>hich crr-e estin~~ated to require less than ten feet of <br />excai~ation_ The srrrall existing steel structure ~~~ill be ren~toved. No ir~dust~•ial processing takes place at <br />this location. The construction schedule is estimated to be 12 to 1=l }nonths after start of construction <br />resulting in a p~°ojected eornpletion in Q=l 2008. <br />c. Explain the project purpose; if the project will be carried out by a governmental unit, exl~~lain the need <br />for the project and identify its beneficiaries. <br />The project is intended. to bring t17e parcel into conforrr7ance i~~~ith the Comprehensive Plan in both <br />_oning and use. The impr•oi~en~rents hill be a Hotel and restaurant and ~i~ill serve the general communifj>. <br />No goi~e~°nn~ental assistance is regzrested and it is not anticipated any goi~erm77ental assistaa~ce ~~,ill be <br />regzrirecl. The beneficiaries ~~1i11 be t17e general con~muni>)~ t1~ru the ira7provement of the site, general <br />increase in die tax roll, access to the hotel and restaurant by residents of the community as ~~nell as <br />others. The site has been idle for n2an_y yeas°s under the threat of condemnation by the City of Roseville <br />• a a r _- -• ~' -- -- <br />and has been gfZueu for re~o~izi~ig~Or r1-107-e than a decade. <br />d. Are future stages of this development including development on any outlots planned or likely to <br />happen? _Yes ~ No <br />If yes, briefly describe future stages, relationshipto present project, timeline and plans for <br />enviroiunental review. <br />e. Is this project a subsequent stage of an earlier project? _Yes X No <br />If yes, briefly describe the past development, timeline and any past enviromnental review. <br />7. Pr®jeet magnitude data <br />Total project acreage 3.42 <br />I~TUmber of residential units: unattached NONE attached maximum units per building <br />Commercial, industrial or institutional building area (gross floor space): total square feet 78,364 <br />Indicate areas of specific uses (in square feet): Hotel 73,364 sq.ft. Restaurant 5,000 sq.ft. <br />Office Manufacturing <br />Retail Other industrial <br />Warehouse Institutional <br />Lig]Zt industrial Agricultural <br />Other commercial (specify) <br />Bui1di11g height 4 floors If over 2 stories, compare to heights of nearby buildings - 1 story <br />8. Permits amd approvals required. List all known local, state and federal permits, approvals and <br />financial assistance for the project. Include modifications of any existing permits, governmental review <br />of plans and all direct and indirect forms of public financial assistance including bond guarantees, Tax <br />Increment Financing and infiastructure. <br />Unit of ~overmnent T TUB e of application Status <br />City -Roseville PU~D Pending <br />City -Roseville Re-zoning Pending <br />City -Roseville Division of Land Pending <br />9. Land use. Describe cul-~-ent and recent past land use and development on the site and on adjacent lands. <br />Discuss project compatibility with adjacent and nearby land uses. Indicate whether any potential <br />conflicts involve environmental matters. Identify any potential environmental hazards due to past site <br />