My WebLink
|
Help
|
About
|
Sign Out
Home
2009_0126_Packet
Roseville
>
City Council
>
City Council Meeting Packets
>
2009
>
2009_0126_Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/6/2012 3:24:10 PM
Creation date
4/20/2009 9:31:00 AM
Metadata
Fields
Template:
General
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
395
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Attachment B <br />Regular City Counci'1 Meeting <br />Monday, September 22, 2008 <br />Page 4 <br />At �he request of Mayor T�lausing, Finance Director Chris Miiler briefly reviewed <br />this item. <br />Mayor Klausing noted a recent Pioneer Press article abaut the City Council con- <br />sidering a resalution of support for Ramsey County keeping the library open at a <br />location in Roseviile during construction. 1Vlayor I�lausing clarified that it was <br />t�ie decision of the Rarnsey County B�ard, not the City CounciI, as to whether the <br />facility was kept open. However, Mayor Klausing spake in support of a facility <br />rerr�aining open in lzoseville for the benefit of Roseville residents and surrounding <br />communities. <br />1'ust maved, Ihlan secanded; adoption ofRes�lution No. 1065$ entitled, "Resolu- <br />tion Encouraging Ramsey Coun�y t� Keep the Roseville Library Branch Qpen <br />D�ing �teconstxuction;" as amended to rend (Lines 66-70: <br />"NOW, THEItEF01�, BE IT R�SOLVED, tlrat tlie Rose�ille City C�un�ciC en- <br />courr�ges t{te Ratnsey County Bor�rr� of Comrrirssioners 10 keep �tt interim Itose- <br />vilCe Library open �in Rosevillel rr� some capacity for t/ze co�rzm�cnity during re= <br />construction. " <br />Roll Call <br />Ayes: Roe; I1�lan; Willmus; Pust; and Klausing. <br />N�ys: Non.e. <br />Mayor �lausing wished the Library Board well in their presentatian to the Rarn- <br />sey County Bo�rd. <br />Councilmember Pust encouraged residents to Yet their elected County afficials <br />know their interest in 1�Eeping the library open in Roseville during constrt�ction. <br />9. General Ordinances for Adapti.on <br />10. PresentaEions <br />11. Public Hearings <br />a. Public Hearing to Consider Establishment of Ho�sing Im�ravement Area for <br />Weshvood Village I <br />City af Rosevilie Housing Program Co�rdinator Jeanne Kelsey reviewed the <br />background, proposal and suggested Counci! Action related to the request af <br />We�twood Village I for establisl�meni of a H�using ImprovEment Area (�IA) as <br />detailec� in the staff r�port dated September 22, 2008. Ms, Kefsey highlighted <br />specifics of HIA's, included 'in Section 3 of the staff report. Ms: I�elsey reviewed <br />staf�s analysis, revzew of the Association's current financial situation and future <br />financial plan. <br />
The URL can be used to link to this page
Your browser does not support the video tag.