My WebLink
|
Help
|
About
|
Sign Out
Home
2009_0207_ Packet_ Spec_StratPlanning
Roseville
>
City Council
>
City Council Meeting Packets
>
2009
>
2009_0207_ Packet_ Spec_StratPlanning
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/6/2012 2:47:18 PM
Creation date
4/20/2009 9:34:57 AM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
97
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2009 — 2018 Capital Improvement Plan <br />The planned replacements of existing capital items will have significant impacts on funding. <br />Additional depreciation should be set aside to anticipate these replacement needs. The larger cost <br />impacts for replacement items starting in 2012 through 2015 are: <br />❖ Suilding Mechanical Equipment $ 248,000 <br />❖ Roofs for the older sections of City Hall, Public Works, and Fire Station I$ 840,000 <br />❖ Miscellaneous Fixtures and Flooring $ 263,000 <br />Funding will be provided by property t�es. <br />13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.