My WebLink
|
Help
|
About
|
Sign Out
Home
2009_0309_Packet
Roseville
>
City Council
>
City Council Meeting Packets
>
2009
>
2009_0309_Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/6/2012 2:47:18 PM
Creation date
4/20/2009 1:00:28 PM
Metadata
Fields
Template:
General
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
222
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FINANCIAL IMPACTS <br />. TIF District 11 is funding the Infrastructure design work. Staff recommends that the Hazardous <br />. Substance Subdistrict fund the response action plan development. Costs for Sub-Consultants shall be <br />. billed directly to the City with no Consultant markup. <br />STAFF RECOMMENDATION <br />. Staff recommends that the City Council authorize staff to amend the existing contract with WSS and <br />. associates to prepare a response action plan for the Twin Lakes AUAR Subarea I Infrastructure <br />. Improvements. <br />REQUESTED COUNCIL ACTION <br />� Motion to authorize the City Manager to amend the Twin Lakes AUAR SubArea I Infrastructure <br />Improvements Contract with WSS and Associates to include the preparation of a response action plan in <br />the amount of $6,400. <br />Prepared by: Debra Bloom, City Engineer <br />Attachments: None <br />Page 2 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.