My WebLink
|
Help
|
About
|
Sign Out
Home
2009_0309_Packet
Roseville
>
City Council
>
City Council Meeting Packets
>
2009
>
2009_0309_Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/6/2012 2:47:18 PM
Creation date
4/20/2009 1:00:28 PM
Metadata
Fields
Template:
General
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
222
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Department Approval <br />.� <br />Item Description <br />BACKGROUND <br />l�'�, <br />Jy <br />REQUEST FOR COUNCIL ACTION <br />Date: 3/09/2009 <br />Item No.: 12.b <br />City Manager Approval <br />Authorization of the use of Eminent Domain for the acquisition of parcels <br />for street and utility purposes within the Twin Lakes Redevelopment Area <br />In the spring of 2008, the City Council authorized staff to hire WSS Engineering to design the <br />Twin Lakes infrastructure (roads, sewer, water, and storm water) for the area between Cleveland <br />Ave. and Fairview Ave. The design has been ongoing since that time and will be complete by <br />the end of March. <br />In the fall of 2008, the City Council approved the completion of final plans for the first phase of <br />the infrastructure improvements. Phase I improvements include the construction of Twin Lakes <br />Parkway from Cleveland Avenue to Mount Ridge Road and Mount Ridge Road from County <br />Road C2 to Twin Lakes Parkway where it will terminate in a roundabout. Phase I also includes <br />the associated sewer, water, and storm water infrastructure improvements in those areas. The <br />City Council authorized the improvements to be put out to bid this spring, with the expectation <br />that the improvements will be constructed in the 2009 construction season. <br />In February 9, 2009, the City Council authorized the hiring of consultants to conduct appraisals <br />(Dwyer, Dahlen, and Foley) and negotiate the acquisition of land for the needed right-of-way <br />and easements for the Phase I project (WSS Engineering). This work is ongoing and the <br />appraisals are expected to be completed by mid-March. Once the appraisals are complete, WSS <br />Engineering will draft an offer letter to the property owners for the purchase of the right-of-way <br />and easements. On March 23, 2009, it is planned for the City Council to consider the release of <br />the offer letters. <br />On February 23, 2009, the City Council authorized entering into an inter-agency agreement with <br />Metropolitan Council for Metro Transit's Park and Ride Facility on Iona Lane. As part of this <br />agreement, the City committed to the construction of the Phase I Twin Lakes infrastructure <br />would be complete by the end of 2009. <br />Staff believes the construction of Phase I of the Twin Lakes infrastructure is important to <br />undertake at this time since the completion of the first phase will allow for the necessary <br />infrastructure to be in place for when development arrives in the Twin Lakes area. The <br />construction project will also open up the area so it has better visibility to the public and <br />development interests. Finally, the construction of the Phase I infrastructure will demonstrate <br />that Twin Lakes is a"real project" and it is "open for business". <br />The City fully intends to make every attempt complete a direct transaction with the property <br />owners. Initial contact with all of the affected property owners regarding the purchase of land <br />Page 1 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.