Laserfiche WebLink
a. Detailed grading plans with building slab or first floor elevation and drainage <br />direction must be submitted to the City Engineer for review and approval prior to <br />building permit issuance. <br />b. The City policy is to accept parkland or cash in lieu of land dedication for the <br />creation of new lots. In this case, no dedication was required in 1980. <br />c. The City policy is to accept a Sewer Availability Charge (SAC) upon the issuance <br />on building permits for all newly created lots. In this case, new sewer and water <br />service is required for the lot which location shall be approved by the City <br />Engineer. The SAC fee is required and collected at the time the building permit is <br />issued. <br />d. The City Engineer must review and approve the driveway curb cuts along County <br />Road "B" prior to the issuance of building permits. <br />e. No additional street right-of--way is required in this area. <br />f. The applicant must record the two (2) lot minor subdivision within 60 days after <br />the approval of the City Council. <br />g. The applicant will be required to provide the City with the appropriate recording <br />medium necessary to sign for applicant recording at Ramsey County. <br />The motion for the adoption of the foregoing resolution was duly seconded by Council <br />Member Klausing and upon vote being taken thereon, the following voted in favor: Klausing, <br />Kough, Schroeder, Maschka, and Kysylyczyn <br />And the following voted against the same: None <br />WHEREUPON said resolution. was declared duly passed and adopted. <br />2 <br />