Laserfiche WebLink
°� Cedarholm Golf Course <br />' 2395 Hamline Avenue <br />,� Roseville, MN 55113 <br />' �� ""'-� �r; y�"�� <br />� <br />"ir <br />��..f ' <br />� '��. <br />� <br />� = -. � Primary Fiber Trunk: <br />�� Connection Point: <br />�`�.�: <br />4 ! :. ti <br />F �.' . �;� �, , ��":�:.�..,,,1► � Termination Point: <br />.'� �� � '; . -. <br />�..� �__- .� � � • ��? _�, <br />Estimated Costs <br />Facility Connection: <br />• Pathway - Building to Cedarholm Vault: 100 feet <br />• Pathway Cost ($13.50/foot): $1,350 <br />• Fiber Count in Building: 12 strands (12 City Hall) <br />• Inside Termination (grounding, electrical, cabinet): $2,500 <br />• Total Estimated Facility Cost: $ 3,850 <br />Backbone Shared Cost: <br />• Fiber Count: 12 strands Hamline North <br />• Pathway Cost ($4.50/foot): $31,500 <br />Total Estimated Cost: <br />Estimated Useful Life <br />Annual Depreciation <br />Annual Maintenance (Locates) <br />Annual Depreciation (Equipment) <br />Depreciated Annual Cost <br />$ 35,350 <br />20 Years <br />$ 1,767 <br />$ 1,000 <br />$ 1,500 <br />$ 5,067 <br />Hamline Corridor North <br />Cedarholm Vault <br />Roseville City Hall <br />Leased Communication Line Options <br />Frame Relay (T1/DS1) (1.5MB) $ 300/month $ 3,600 Annual <br />Metro-Optical Ethernet (10 MB) $ 1,530/month $ 18,360 Annual <br />Metro-Optical Ethernet (100 MB) $ 2,550/month $ 30,600 Annual <br />*Metro-Optical Ethernet (1G6) $11,560/month $138,720 Annual <br />*Comparable service in terms of technology and available bandwidth <br />