My WebLink
|
Help
|
About
|
Sign Out
Home
2009_0511_Packet
Roseville
>
City Council
>
City Council Meeting Packets
>
2009
>
2009_0511_Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2012 2:43:33 PM
Creation date
7/28/2009 2:21:37 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
185
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
���rr,.��.� � <br />-, � � <br />; r� J r J� ��-�j L����_� , <br />�;;�. , ���� <br />� ��_ ��= _ -:�� <br />. � , � - �+�� <br />rrr-=; t � -- - � q�-� �., ' �- � ;i <br />- i , �e �yr !- <br />F, _ . -.�-. ,� <br />, `� t � - ��, � '� <br />+ L � <br />,-� , th !L k k � R t� � f �t �`L k f <br />- .J � � _ � ,t f k� A . . ■ <br />Estimated Costs <br />Facility Connection: <br />Roseville Area High School <br />1261 Highway 36 W(approx. 1300 County Road 62) <br />Roseville, MN 55113 <br />Primary Fiber Trunk: <br />Connection Point <br />Termination Point: <br />• Pathway — Building to RAHS Vault: 300 feet <br />• Pathway Cost ($0/foot): $0 (Completed 2007) <br />Hamline Corridor North <br />RAHS Vault <br />Roseville City Hall <br />• Fiber Count in Building: 48 strands (6 Fairview, 6 Brimhall, 6 Falcon Heights, 6 Library, 12 <br />City Hall, 6 E.D. Williams, 6 open) <br />• Inside Termination (grounding, electrical, cabinet): $5,000 <br />• Total Estimated Facility Cost: $ 5,000 <br />Backbone Shared Cost: <br />• Fiber Count: 18 strands Hamline North <br />• Pathway Cost: $ 37,333 <br />Total Estimated Cost: <br />Estimated Useful Life <br />Annual Depreciation <br />Annual Maintenance (Locates) <br />Annual Depreciation (Equipment) <br />Depreciated Annual Cost <br />$ <br />$ <br />$ <br />$ <br />$ <br />42,333 <br />20 Years <br />2,100 <br />1, 800 <br />1,500 <br />5,400 <br />Leased Communication Line Options <br />Frame Relay (T1/DS1) (1.5MB) $ 300/month $ 3,600 Annual <br />Metro-Optical Ethernet (10 MB) $ 1,530/month $ 18,360 Annual <br />Metro-Optical Ethernet (100 MB) $ 2,550/month $ 30,600 Annual <br />*Metro-Optical Ethernet (1G6) $11,560/month $138,720 Annual <br />*Comparable service in terms of technology and available bandwidth <br />
The URL can be used to link to this page
Your browser does not support the video tag.