costs than traditional lighting. Since the LED street lights have a higher energy savings, <br />_ we are recommending that we stay with the base bid on this item. Accepting the alternate <br />. would save $7900 on the construction costs. The City will save this cost over time in <br />. energy savings and maintenance costs. <br />. 5. Remote telemetry system- The storm water reuse system is a lift station that will be <br />. managed using a local telemetry system. This system will monitor the moisture in the <br />� soil and the amount of water being stored in the storm water reuse vault. When there is <br />� insufficient water in the vault, it will automatically switch to a potable water supply. <br />� This alternate is to connect this local telemetry system into the City's Supervisory <br />� Control and Data Acquisition (SCADA) monitoring system. All of the City's lift stations <br />� are remotely monitored through SCADA and staff is notified of system failures. Without <br />� this system, staff would have to make frequent site visits to check to ensure the system is <br />� working as designed. We are recommending that this work be included in the proj ect. <br />This adds $8,800.00 to the base bid. <br />POLICY OBJECTIVE <br />� Based on past practice, the City Council has awarded the contract to the lowest responsible <br />� bidder. In the case of the Twin Lakes Infrastructure Improvements, the apparent low bidder is <br />� Eureka Construction, of Lakeville, Minnesota. Reference checks indicate they are a qualified <br />contractor for this project. What follows is a summary of the base bids for this project: <br />Contractor Bid <br />Eureka Construction $2,822,429.45 <br />Belair Builders $2,852,926.43 <br />Carl Bolander & Sons $2,865,319.57 <br />Veit & Compnay, Inc $2,876,798.06 <br />Thomas & Sons Construction $2,979,457.53 <br />Landwehr Construction, Inc $2,993,754.00 <br />Forest Lake Contracting $3,161.747.50 <br />Park Construction $3,333,258.79 <br />FnvaNCiaL IlviracTs <br />. The City received 8 bids for this project. The low base bid was submitted by Eureka <br />� Construction., $2,822,429.45, is 16.5% lower than the final Engineer's base bid construction <br />� estimate of $3,379,191.24. The total bid for this project adding Alternatives 1 and 5 to the base <br />� bid is $2,961,229.45. This is 16% lower than the 90% plan estimate for construction <br />� ($3,523,725) discussed with the Council in April of this year. <br />`. STAFF RECOMMENDATION <br />E Approval of a resolution awarding bid for Twin Lakes Infrastructure Improvements Project in <br />� the amount of $2,961,229.45 to Eureka Construction, of Lakeville, Minnesota. <br />Page 2 of 3 <br />