Laserfiche WebLink
Department Approval <br />� <br />l�'�, <br />Jy <br />REQUEST FOR COUNCIL ACTION <br />Date: 6/15/09 <br />Item No.: 12.f <br />City Manager Approval <br />Item Description: Authorize Contract for Construction Engineering Services for Twin Lakes Phase I <br />Infrastructure Improvements <br />BACKGROUND <br />The City Council awarded a contract to WSB and Associates for the Twin Lakes infrastructure <br />improvements in 2008. Subsequently later in the year the Council authorized staff to finalize plans and <br />prepare bid documents for Twin Lakes Phase I Infrastructure improvements. These improvements <br />include the construction of Twin Lakes Parkway between Cleveland Avenue and Mount Ridge Road <br />and Mount Ridge Road between Twin Lakes Parkway and County road C-2. The project includes the <br />construction of utilities and storm water improvements meeting Rice Creek Watershed District permit <br />requirements as well as streetscape elements including sidewalks. The proj ect was advertised for bid in <br />May and is proposed to be awarded on June 15th to the low bidder. Construction is expected to begin as <br />� early as the week of June 22"d. As the design services contract only included services to take the project <br />� to award of bid we need to contract for construction engineering services. This would include field <br />� inspection services, project management, construction contract administration, and field environmental <br />� inspection, testing, and reporting. <br />� Staff considered soliciting proposals from multiple firms for this work After discussing with other firms <br />� not currently associated with this proj ect we chose not to do a formal request for proposals. This <br />� decision was made due to the unique design of storm water treatment facilities for this proj ect and the <br />project understanding that the current team has gained through the design process. Construction <br />� engineering costs are closely related to the time it takes to construct a project and the hourly rates of the <br />. assigned personnel. We have compared the hourly rates of the WSB team and have determined they are <br />. very competitive and in most recent proposals for other projects lower than their competitors. They have <br />. proposed a cost estimated at $320,194 or approximately 10% of construction cost assuming a 24 week <br />. construction schedule. This cost is in line with what similar proj ects typically require for construction <br />. engineering. This schedule does meet the requirements of the city's agreement with the Metropolitan <br />Council. <br />POLICY OBJECTIVE <br />_ The Twin Lakes project has long been identified as a priority for the City. The awarding of a contract <br />. for construction engineering services is critical in order to complete the majority of the Phase I <br />. improvements before the end of this year. Metro Transit is under construction for their park-and-ride <br />. parking structure along Mount Ridge Road. This facility is expected to be open by the end of the year. <br />� The city typically awards engineering contracts to the firm best qualified to deliver the desired outcome <br />at a cost that is competitive. <br />Page 1 of 2 <br />