Laserfiche WebLink
FnvaNCiaL IlviracTs <br />. The cost proposed for this proj ect is in the range of what one would typically expect for construction <br />. engineering services. WSB and Associates have agreed to city staff providing some of the field <br />. inspection once the city's other projects are completed in mid to late summer. This will potentially <br />. reduce the cost of this contract by $50,000 or more. The proposal from WSB and Associates for <br />. $320,194 is assuming the city is not able to provide any field inspection. <br />. This proj ect is being funded by grant monies, TIF balances, and cost allocation from the Metro Transit <br />- project. Ultimately the city will be reimbursed for the TIF balance contribution through future cost <br />allocations from redevelopment. <br />STAFF RECOMMENDATION <br />Authorize a contract with WSB & Associates for construction engineering services for Twin Lakes <br />Phase I Infrastructure Improvements. (See attachment A) <br />REQUESTED COUNCIL ACTION <br />Motion to authorize a contract with WSB & Associates for construction engineering services for Twin <br />Lakes Phase I Infrastructure Improvements in the amount of $320,194. <br />Prepared by: Duane Schwartz, Public works Director <br />Attachments: A: WSB and Associates Proposal and Contract <br />Page 2 of 2 <br />