��,����� �������� The schedule for the construction adrr�inistration will fallow the construction <br />sched�le created by W5B and the City in coaperation with Metro Transit. We <br />assume the project will start on june Z2, 2009. 'ihe anticipated duration of ehe <br />project will be 24 weeks, with the possibility of some �nal work Finishing in the <br />Spring of 20ZQ. Hawever, traffic will be apen by October 30, 2009, at the latest. <br />���'� The estimated hours for projeet management and construction observation are <br />based solely on anticipated wee�Cly hours and the construction duration provided <br />in the project sch.edule. It is important to note that actual hours for contract <br />management and construction observation wil! be dictated by rhe actual <br />construction schedule. <br />Construction s�aking and record drawing preparation indicate total praject hours <br />based on similar-size projects we have done in the past. A!i estimated hours are <br />muftiplied by the appropriate ho�rly rates per WSB's 2009 Fee Schedule <br />{attached). The tota� estimated eost for the construction administrakion is <br />$320,I94 which represents appraxirtiately 10°/a pf the engineer's opinion af <br />prol�able cost of construction. <br />� <br />� <br />� <br />� <br />a <br />� <br />\ <br />� <br />n <br />� <br />t� <br />C,� <br />C <br />C"" <br />C17 <br />\ <br />� <br />[� <br />m <br />C/� <br />�8+a3O - 5 - � � <br />8 A.vsru�arer_ Inr <br />