Laserfiche WebLink
k j <br />ss <br />. <br />Mr. Jupe Hale <br />WSB 8� Associates, lnc. <br />7D1 Xenia Avenue South <br />Suit.e 3U0 <br />Minneapolis, MN 55416 <br />Description: <br />COST ESTIi�ATE <br />BL-08-02387C 'Twin Lakes Roadways (Phase Ij <br />Serrrice D�scription: RAPICCP lmplementatiqn <br />Work Location: Mount Ridge Road 8� Twin Lakes Pkwy <br />Rose�ilfe, MN <br />Estimator: Jason Kunze <br />Quantity. Units: Unit Price: Extension: <br />5oil ScreeninglField Anafysis (estimated daily field aversight casts during excavation activities) <br />Technician IV 10.40 Hours 90.00 <br />CADDIGraphics Operatar D.50 Hour 86.00 <br />Vehicle, per day 1.D0 Days 37.00 <br />Vehic{e, per mile 60.00 Miles 0.75 <br />PIR w110.6 eV lamp, per day 1.00 Days 90.00 <br />7rimble R8 Rover (horizontal and vertical), p�r hpur i.OQ Hour 52.00 <br />Phase Total: <br />Soil Ghemistry (pricing per sample, with quantitylparameters dictated by feld conditions and the MPCA) <br />RCRA metals: As,Ba,Cd,Cr,Hg,Pb,Se,Ag, soil 1.00 Tesf 128.00 <br />Gaso6ne Range Organics (GRO) - soil 1.00 Test �31.00 <br />C7iesel Range �rganics (DRO) - Soil 1.00 T�st 5D.0� <br />VOC, MDH 486 List - Sail �.00 Test 135.OD <br />Polyaromatic Hydrocarbons ( PAHs) ppm - Soil � AO Test 190.Q0 <br />Phase To#al: <br />900.00 <br />43.0� <br />37.0� <br />45.00 <br />90.00 <br />52.00 <br />$1, 9 67.00 <br />128.00 <br />41.00 <br />50.00 <br />135.00 <br />190.00 <br />$544.�0 <br />Groundwater Chemistry (sam� assump#ions as Soil Chemistry listad above) <br />RCRA rrietals: As,Ba,Cd,Cr,Ng,Pb,Se,Ag, water 1.00 Test 12$.00 1�8.Oa <br />Gas Range Organics (GRO), water 1.00 Tesi 41.00 41.00 <br />Diesel Range Organics (DRO) - Water 1.00 Test 50.00 5D.00 <br />V�C, MDH 465 List - Water 1.00 Test 135.OD 135.00 <br />Polyaromatic Hydr�carbans (PAHs) - Water 1.Q0 Test 190.00 190.00 <br />Phase Total: $544.00 <br />Praject Reporting (preparation o# the RAPICCP Implementation Report) <br />Scier�tist-in-Training 40.00 Hours 93.00 3,720.40 <br />Senior Scientist 30.00 Hours 149.OQ 4,470.00 <br />Principal Scientist 8.00 Hours 167.40 1,336.�0 <br />CADDIGraphics Operator 6.00 Hour 86.00 516.00 <br />Phase Total: $10,042.OD <br />Project Meetings (1 wl MPCA, 1 wl W5B & City, and 1 pre-con meeting) <br />Scientist-in-Trairting <br />3.00 Meefings 4.00 Haurs per Meeting <br />Senior Scientist <br />Principal Scientist <br />Vehicle, per mile <br />3.00 Meefrngs 4.00 Hours per Meeting <br />1.00 Meeting at 4.Q0 Hours per Meetrng <br />Page 1 oi 2 <br />12.4a Hours <br />12.OD Hours <br />4.00 Hours <br />350.00 Miles <br />Phase Total <br />93.�0 1,116.00 <br />i 49.00 1, 788.00 <br />167.00 66$.00 <br />0.75 262.50 <br />$ 3, 834. 50 <br />