Laserfiche WebLink
COST ESTiMATE <br />I� T E RT E C BL-08-023$7C Twin Lakes Roadwavs (Phase I} <br />Project Management (�aifv Estimate) during Implement of RAPICCP <br />Scientist-in-Training 2.00 Hours 93.D0 <br />Seniar Scientist 0.5D Naurs 149.00 <br />Phase iotal: <br />SUMMARY <br />Soil Screeningl�ield Analysis (assumes 3D days at $1,167 per day) <br />Soil Chemistry (assumes 20 samples @$544 per sample) <br />Gro�ndwater Chernistry (assumes 4 samples at $544 per sample} <br />Project Reporiing <br />Project Meetings <br />Project Management (assumes 30 days at $260.50 per day) <br />Total: <br />Page 2 of 2 <br />35,Q10 <br />9p,880 <br />2,176 <br />10, 042 <br />3,835 <br />7,815 <br />$69,758 <br />1$6.OQ <br />74.50 <br />$26fl.50 <br />